Swazi Paper Mills Ltd
Sector: Manufacturing (Industrial) • Location: Eswatini
Source: International Finance Corporation (IFC)
The proposed IFC loan is to assist the upgrading one of two Kraft paper machines (designated KPM2) at Swazi Paper Mills Limited (SPM). The project is central to the sponsor''s plan to rationalize production and supply of fluting and liner material to the South African corrugated box manufacturing industry. KPM1 currently produces only test liner material and the other Kraft paper machine (KPM2) pr
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The proposed IFC loan is to assist the upgrading one of two Kraft paper machines (designated KPM2) at Swazi Paper Mills Limited (SPM). The project is central to the sponsor''s plan to rationalize production and supply of fluting and liner material to the South African corrugated box manufacturing industry. KPM1 currently produces only test liner material and the other Kraft paper machine (KPM2) produces both test liner and fluting. KPM2 has been upgraded progressively since 1999 to increase paper width and to increase production capacity. This latest upgrade would enable the machine to produce only fluting and allow the sponsor to dedicate both KPM1 and KPM2 to producing only fluting material, while all test liners are produced at Unicell, the sponsor’s new paper mill in Johannesburg, South Africa. The machine upgrade and production change at SPM is expected to lead to increased production and cost saving. KPM2 was installed in 1995, financed partly with an IFC loan, which will be repaid in September 2002. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
