logo
Project

Swaziland - Lower Usuthu Smallholders Irrigation Project II

Sector: Raw Materials • Location: Eswatini

Source: African Development Bank (AfDB)

The second phase of the Swaziland Lower Usuthu Basin Irrigation Scheme (LUSIP II) follows LUSIP I, which was approved on November 27, 2003 (and completed in 2010), following recognition. by the Government of the excellent opportunity offered by the natural resource potential of the lower Usuthu river basin. The entire LUSIP is aimed at diverting part of the Usuthu River's peak flow to a storage ta

Sector
Raw Materials, Commercial, Water Supply and Storage, Fertilizers, Government
Location
Eswatini
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Swaziland - Lower Usuthu Smallholders Irrigation Project II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Swaziland - Lower Usuthu Smallholders Irrigation Project II” is an infrastructure initiative in the Raw Materials sector, located in Eswatini. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The second phase of the Swaziland Lower Usuthu Basin Irrigation Scheme (LUSIP II) follows LUSIP I, which was approved on November 27, 2003 (and completed in 2010), following recognition. by the Government of the excellent opportunity offered by the natural resource potential of the lower Usuthu river basin. The entire LUSIP is aimed at diverting part of the Usuthu River's peak flow to a storage tank with a capacity of 155 million cubic meters out of the riverbed. The stored water would be used to irrigate 11,500 ha of downstream (two-phase) land for sugar cane production. For LUSIP II, it is an autonomous investment project that aims to increase agricultural production and household incomes in the Lower Usuthu Basin. The total cost of the project, net of taxes and duties, but including the vagaries of performance and the provision for price increase, is estimated at ZAR 2.01 billion (UA 104.15 million). It has four main components, namely: (i) Development of the main distribution network; (ii) Construction of the secondary irrigation network supplying the various irrigation blocks, each of which covers 100-700 ha; (iii) Agricultural Infrastructure Development; and iv) Project Coordination and Management.

Original sector

Agriculture, Forestry, Fishing

Budget

Location

Country

Eswatini

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Raw Materials, Commercial, Water Supply and Storage, Fertilizers, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project