logo

Swaziland - Lower Usuthu Smallholders Irrigation Project II

Sector: Raw Materials • Location: Eswatini

Source: African Development Bank (AfDB)

Project

The second phase of the Swaziland Lower Usuthu Basin Irrigation Scheme (LUSIP II) follows LUSIP I, which was approved on November 27, 2003 (and completed in 2010), following recognition. by the Government of the excellent opportunity offered by the natural resource potential of the lower Usuthu river basin. The entire LUSIP is aimed at diverting part of the Usuthu River's peak flow to a storage ta

Project Information FAQ

Project Information

4 Q
The project “Swaziland - Lower Usuthu Smallholders Irrigation Project II” is an infrastructure initiative in the Raw Materials sector, located in Eswatini. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The second phase of the Swaziland Lower Usuthu Basin Irrigation Scheme (LUSIP II) follows LUSIP I, which was approved on November 27, 2003 (and completed in 2010), following recognition. by the Government of the excellent opportunity offered by the natural resource potential of the lower Usuthu river basin. The entire LUSIP is aimed at diverting part of the Usuthu River's peak flow to a storage tank with a capacity of 155 million cubic meters out of the riverbed. The stored water would be used to irrigate 11,500 ha of downstream (two-phase) land for sugar cane production. For LUSIP II, it is an autonomous investment project that aims to increase agricultural production and household incomes in the Lower Usuthu Basin. The total cost of the project, net of taxes and duties, but including the vagaries of performance and the provision for price increase, is estimated at ZAR 2.01 billion (UA 104.15 million). It has four main components, namely: (i) Development of the main distribution network; (ii) Construction of the secondary irrigation network supplying the various irrigation blocks, each of which covers 100-700 ha; (iii) Agricultural Infrastructure Development; and iv) Project Coordination and Management.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data