Swaziland - Lower Usuthu Smallholders Irrigation Project II
Sector: Raw Materials • Location: Eswatini
Source: African Development Bank (AfDB)
The second phase of the Swaziland Lower Usuthu Basin Irrigation Scheme (LUSIP II) follows LUSIP I, which was approved on November 27, 2003 (and completed in 2010), following recognition. by the Government of the excellent opportunity offered by the natural resource potential of the lower Usuthu river basin. The entire LUSIP is aimed at diverting part of the Usuthu River's peak flow to a storage ta
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The second phase of the Swaziland Lower Usuthu Basin Irrigation Scheme (LUSIP II) follows LUSIP I, which was approved on November 27, 2003 (and completed in 2010), following recognition. by the Government of the excellent opportunity offered by the natural resource potential of the lower Usuthu river basin. The entire LUSIP is aimed at diverting part of the Usuthu River's peak flow to a storage tank with a capacity of 155 million cubic meters out of the riverbed. The stored water would be used to irrigate 11,500 ha of downstream (two-phase) land for sugar cane production. For LUSIP II, it is an autonomous investment project that aims to increase agricultural production and household incomes in the Lower Usuthu Basin. The total cost of the project, net of taxes and duties, but including the vagaries of performance and the provision for price increase, is estimated at ZAR 2.01 billion (UA 104.15 million). It has four main components, namely: (i) Development of the main distribution network; (ii) Construction of the secondary irrigation network supplying the various irrigation blocks, each of which covers 100-700 ha; (iii) Agricultural Infrastructure Development; and iv) Project Coordination and Management. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Raw Materials projects in Eswatini
- FirstRand Rest of Africa Central Bank Mandatory Reserves Coverage
- Swaziland- Mbabane Manzini corridor (Nondvo) multipurpose dam study
- Swaziland - Emergency Humanitarian Relief Assistance to drought affected populations
- Eswatini - Mkhondvo-Ngwavuma Water Augmentation Program Phase IA (MNWAP-1A)
- Eswatini - Mkhondvo-Ngwavuma Water Augmentation Program Phase IA (MNWAP-1A)
- Eswatini - Komati Downstream Development Project (KDDP)
- Eswatini - Lower Usuthu Smallholder Irrigation Project Preliminary Studies Phase II
- Eswatini - Emergency Humanitarian Relief Assistance to drought affected populations
