Swaziland - Lower Usuthu Smallholders Irrigation Project II
One of 462 projects Taiyo tracks in Eswatini.
Source: African Development Bank (AfDB)
The second phase of the Swaziland Lower Usuthu Basin Irrigation Scheme (LUSIP II) follows LUSIP I, which was approved on November 27, 2003 (and completed in 2010), following recognition. by the Government of the excellent opportunity offered by the natural resource potential of the lower Usuthu river basin. The entire LUSIP is aimed at diverting part of the Usuthu River's peak flow to a storage ta
- Sector
- Raw Materials, Commercial, Water Supply and Storage, Government
- Location
- Eswatini
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Swaziland - Lower Usuthu Smallholders Irrigation Project II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The second phase of the Swaziland Lower Usuthu Basin Irrigation Scheme (LUSIP II) follows LUSIP I, which was approved on November 27, 2003 (and completed in 2010), following recognition. by the Government of the excellent opportunity offered by the natural resource potential of the lower Usuthu river basin. The entire LUSIP is aimed at diverting part of the Usuthu River's peak flow to a storage tank with a capacity of 155 million cubic meters out of the riverbed. The stored water would be used to irrigate 11,500 ha of downstream (two-phase) land for sugar cane production. For LUSIP II, it is an autonomous investment project that aims to increase agricultural production and household incomes in the Lower Usuthu Basin. The total cost of the project, net of taxes and duties, but including the vagaries of performance and the provision for price increase, is estimated at ZAR 2.01 billion (UA 104.15 million). It has four main components, namely: (i) Development of the main distribution network; (ii) Construction of the secondary irrigation network supplying the various irrigation blocks, each of which covers 100-700 ha; (iii) Agricultural Infrastructure Development; and iv) Project Coordination and Management. |
Original sector | Agriculture, Forestry, Fishing |
Budget |
Location
Country | Eswatini |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Raw Materials, Commercial, Water Supply and Storage, Government |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Raw Materials projects in Eswatini
- Swaziland- Mbabane Manzini corridor (Nondvo) multipurpose dam study
- FirstRand Rest of Africa Central Bank Mandatory Reserves Coverage
- Swaziland - Emergency Humanitarian Relief Assistance to drought affected populations
- Eswatini - Mkhondvo-Ngwavuma Water Augmentation Program Phase IA (MNWAP-1A)
- Eswatini - Komati Downstream Development Project (KDDP)
- Eswatini - Lower Usuthu Smallholder Irrigation Project Preliminary Studies Phase II
- Eswatini - Emergency Humanitarian Relief Assistance to drought affected populations
- Mbabane-Mhlambanyatsi Road (ADF)
