Sweet Road Remove Buried Fuel Oil Tank
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
This project is for the removal of a buried fuel tank. Approximately a 550-gallon tank. The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 120 days of award, unless modified below. This is a NYS Public Works project, and prevailing wages are to be
- Status
- Closed
- Sector
- Consumer Products, Raw Materials, Road, Commercial, Oil and Gas
- Location
- Queensbury, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Sweet Road Remove Buried Fuel Oil Tank
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project is for the removal of a buried fuel tank. Approximately a 550-gallon tank. The vendor shall provide all labor and materials necessary to complete the work in a professional manner according to scope of work and architectural drawings if supplied. Work is to be completed within 120 days of award, unless modified below. This is a NYS Public Works project, and prevailing wages are to be paid. Refer to attached specification for the following scope of work. Site must be cleaned, and ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Queensbury |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Raw Materials, Road, Commercial, Oil and Gas |
Article published date | 2025-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- CS 611/SURSSON STREET FROM SR 4 TO OLD BEN CARTER ROAD - TIA
- EAST TOLLISION STREET
- NORMAN BERRY DR/BOBBY BROWN FROM SUMNER PARK TO VIRGINIA AVE
- NEW DETACHED ADU, 840 SQ.FT. AND NEW PORCH, 32 SQ.FT.
- NEW DETACHED ADU 799 SQ. FT. - 3 BED 2 BATH
- BLDG 3, UNIT 4, NEW TOWNHOME WITH GARAGE 1605 SQ FT LIVING, 482 SQ FT GARAGE
- The Kia Forum
- William R. Boone High School
