Sweetwater Hyperscale Growth Valve Campus
Sector: Power Generation (CCGT) • Location: Sweetwater, Texas, USA
Source: Northwise Project
Located in ERCOT West Texas, Sweetwater campus has 2.0 GW secured power split between Sweetwater 1 (1.4 GW) and Sweetwater 2 (600 MW). Sweetwater 1 substation was energized on May 1, 2026, and initial IT load build-out is underway. The campus is engineered for high-density liquid-cooled deployment and governs capacity expansion through 2027 and beyond.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Data Center
- Location
- Sweetwater, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Northwise Project
ConstructChat
Ask ConstructChat about Sweetwater Hyperscale Growth Valve Campus
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | operational and under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Located in ERCOT West Texas, Sweetwater campus has 2.0 GW secured power split between Sweetwater 1 (1.4 GW) and Sweetwater 2 (600 MW). Sweetwater 1 substation was energized on May 1, 2026, and initial IT load build-out is underway. The campus is engineered for high-density liquid-cooled deployment and governs capacity expansion through 2027 and beyond. |
Original sector | Energy and AI Infrastructure |
Location
Country | United States of America (USA) |
State | Texas |
City | Sweetwater |
Source
Source | Northwise Project |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Data Center |
Article published date | 2026-07-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in USA
- Widen Turnpike SR 91 from Golden Glades Toll Plaza to the Broward County
- Lotte Chemical MEG-1 Project
- Fourth Avenue Corridor Utility Replacement - MEP Bidders
- Utility Work on I-75
- Google and Elementl Power Nuclear Energy Partnership
- Tanker On-Shore Power Supply Compatibility Assessment
- East Hampton Circle Reconstruction
- Rice University Data Center Heat to Electricity Project
