Swift Current health P3 project (Saskatchewan)
The owner, status and timeline of this project. A free account opens every field.
Source: InfraPPPWorld
The Project will replace the three existing long term care facilities, including the adult day program, with one new long term care facility to include 225 long term care beds. The Facility will provide care for the full range of residents' needs including all clinical care and services appropriate for intensive personal or nursing care (Level 3) and extended care (Level 4).The purpose of the Proj
- Status
- Closed
- Sector
- Hospital
- Location
- Canada
- Updated
- 22 Jul 2026
- Source
- InfraPPPWorld
ConstructChat
Ask ConstructChat about Swift Current health P3 project (Saskatchewan)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project will replace the three existing long term care facilities, including the adult day program, with one new long term care facility to include 225 long term care beds. The Facility will provide care for the full range of residents' needs including all clinical care and services appropriate for intensive personal or nursing care (Level 3) and extended care (Level 4).The purpose of the Project is to design, build, finance and maintain a 225-unit long term care facility in Swift Current, Saskatchewan. |
Original sector | Social & Health |
Procurement method | |
Budget |
Location
Country | Canada |
Source
Source | InfraPPPWorld |
URL |
More Details
Record type | Project |
Sector | Hospital |
Article published date | 2025-03-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
