logo

Swift Current Long Term Care Centre Project

Sector: Education • Location: Swift Current, Saskatchewan, Canada

Source: P3Spectrum, Canada

Project
Operational

Opportunity The Cypress Regional Health Authority owned 30 acres of undeveloped land adjacent to the regional hospital. Developing a new, much needed long-term care facility on 15 acres of this site in proximity to the existing hospital will create operational efficiencies. A public-private partnership was selected in part because it would allow the project to proceed under an ambitious timeline.

Project Information FAQ

Project Information

5 Q
The project “Swift Current Long Term Care Centre Project” is an infrastructure initiative in the Education sector, located in Swift Current, Saskatchewan, Canada. Taiyo aggregates data on it from P3Spectrum, Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

operational

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Opportunity The Cypress Regional Health Authority owned 30 acres of undeveloped land adjacent to the regional hospital. Developing a new, much needed long-term care facility on 15 acres of this site in proximity to the existing hospital will create operational efficiencies. A public-private partnership was selected in part because it would allow the project to proceed under an ambitious timeline. Innovations Residents, families and staff were involved in the early stages of the design to ensure that the facility will create a home-like environment for the residents and be suitable for resident and family-centred care. The input was incorporated into the design specifications and provided to proponent teams during the competitive selection process. In December 2013, SaskBuilds and Cypress Health Region hosted a business-to-business networking event in Swift Current to introduce local businesses to the short-listed proponents. More than 40 local business owners and representatives used the opportunity to familiarize the proponent teams with local services available. The Operating Period Joint Committee—comprising Cypress Health Region, Plenary Health and SaskBuilds—will meet monthly over the operating period to review performance over the life of the contract. Results The new facility provides 225 long-term care beds housed in 21 10-bed houses, and one 15-bed house, promoting a home-like environment for residents. Access to natural light and the outdoors were important design considerations and residents will enjoy large windows with interesting views of garden space. The single-level, semi-circular design was developed with shorter corridors and fewer corners to optimize wheelchair access and increase staff efficiency. Smart technology is incorporated throughout the facility including through the use of handheld communication devices, charting tablets, resident wandering prevention systems, and ceiling lifts in every room. The project is the first in the healthcare sector to be delivered by the Government of Saskatchewan using the P3 approach. The facility includes an adult day care centre, a services centre, and a link to the hospital. It replaces three older facilities: Swift Current Care Centre, Prairie Pioneers Lodge, and Palliser Regional Care Centre. The region will maintain full ownership of the facility and will operate all aspects of the direct care provided within the facility.  Existing health region staff will provide services for residents and maintain the provincial standards and guidelines that have been set for long-term care programs and services within the province. The long-term care facility is situated in close proximity to schools and the City’s recreation facilities, including a leisure aquatic centre and an indoor field house, providing residents with exceptional educational, recreational and programming opportunities. Using a P3 model is saving more than 13 per cent compared with traditional procurement. “For those individuals that require the highest levels of care, it is really exciting to see this world-class facility coming to our region. Municipalities all have so much on our plates with our own infrastructure needs and confirming the 20 per cent local share takes a lot of hard work and a positive vision for the residents of our region over the long term.  I’m really proud of the way municipalities are standing shoulder-to-shoulder and look forward to reaching to others to finalize the local share.” - Swift Current Mayor Jerrod Schafer

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data