Switch and Crossing Optimal Design and Evaluation
Sector: Rail • Location: United Kingdom, Czechia, Spain, Austria
Source: EU Funding & Tenders Portal
The overall aim of the S-CODE project is to investigate, develop, validate and initially integrate radically new concepts for switches and crossings that have the potential to lead to increases in capacity, reliability and safety while reducing investment and operating costs. The S-CODE project will identify radically different technology concepts that can be integrated together to achieve signifi
- Status
- Closed
- Sector
- Rail, Education
- Location
- United Kingdom, Czechia, Spain, Austria
- Updated
- 22 Jul 2026
- Source
- EU Funding & Tenders Portal
ConstructChat
Ask ConstructChat about Switch and Crossing Optimal Design and Evaluation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | ended |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The overall aim of the S-CODE project is to investigate, develop, validate and initially integrate radically new concepts for switches and crossings that have the potential to lead to increases in capacity, reliability and safety while reducing investment and operating costs. The S-CODE project will identify radically different technology concepts that can be integrated together to achieve significantly improved performance for S&C based around new operating concepts (e.g. super-fast switching, self-healing switch). The project will build on existing European and national research projects (in particular, the lighthouse project In2Rail, Capacity4Rail and Innotrack) to bring together technologies and concepts that will significantly reduce the constraints associated with existing switch technologies and develop a radically different solution. The project will be divided into three phases: Phase 1: Requirements and initial design - focusing on understanding constraints and critical requirements, and developing a radically different architecture and operation that makes use of technologies from other domains; Phase 2: Technical development - undertaking detailed modelling and simulation to identify an optimal configuration to maximise performance; Phase 3: Validation and evaluation - testing (to TRL4) the design concepts and formally evaluating their performance in order that an integrated design can be presented for further development. |
Location
Country | United Kingdom, Czechia, Spain, Austria |
Source
Source | EU Funding & Tenders Portal |
URL |
More Details
Record type | Project |
Sector | Rail, Education |
Article published date | 2026-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
