logo

Switch Pyramid Campus Expansion in Gaines Charter Township

Sector: Water Supply and Storage • Location: Gaines Charter Township, Michigan, United States

Source: wwmtarc

Project
Under Construction

Data center located in Gaines Charter Township, Michigan, known as the Switch Pyramid Campus. The company is expanding by building a second facility on site and planning a third, with new infrastructure including a power substation and fiber optics. The expansion will use hundreds of megawatts and operates on 100% renewable energy.

Status
Under Construction
Sector
Water Supply and Storage, Data Center, Power Generation (CCGT), Commercial
Location
Gaines Charter Township, Michigan, United States of America
Updated
22 Jul 2026
Source
wwmtarc

ConstructChat

Ask ConstructChat about Switch Pyramid Campus Expansion in Gaines Charter Township

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Switch Pyramid Campus Expansion in Gaines Charter Township” is an infrastructure initiative in the Water Supply and Storage sector, located in Gaines Charter Township, Michigan, United States. Taiyo aggregates data on it from wwmtarc.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Data center located in Gaines Charter Township, Michigan, known as the Switch Pyramid Campus. The company is expanding by building a second facility on site and planning a third, with new infrastructure including a power substation and fiber optics. The expansion will use hundreds of megawatts and operates on 100% renewable energy.

Original sector

Technology

Location

Country

United States of America (USA)

State

Michigan

City

Gaines Charter Township

Source

Source

wwmtarc

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Data Center, Power Generation (CCGT), Commercial

Article published date

2025-11-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project