logo
ProjectCompleted

SWPCC Biosolids System Upgrades

One of 4,618 projects Taiyo tracks in Prince Edward Island.

Source: Infrastructure Canada

This project consists of the installation of a new solid bowl centrifuge and odour control equipment in the existing biosolids building. The centrifuge will require minor electrical wiring and mechanical piping modifications to the existing plant setup. The new centrifuge will replace one existing rotary press and will result in very few changes to the solids handling process upstream. Waste activ

Status
Closed
Sector
Water Supply and Storage, Commercial, Government
Location
Prince Edward Island, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about SWPCC Biosolids System Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SWPCC Biosolids System Upgrades” is an infrastructure initiative in the Water Supply and Storage sector, located in Prince Edward Island, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project consists of the installation of a new solid bowl centrifuge and odour control equipment in the existing biosolids building. The centrifuge will require minor electrical wiring and mechanical piping modifications to the existing plant setup. The new centrifuge will replace one existing rotary press and will result in very few changes to the solids handling process upstream. Waste activated sludge will continue to be wasted to the rotary drum thickener (RDT) via the existing WAS pumps. Following thickening the sludge will drop into the blend tank where it will be combined with primary sludge prior to being fed to the centrifuge. The existing progressive cavity pumps installed in the sludge blending pump station will deliver the sludge to the new centrifuge. The scrubber will be installed between the existing two stacks of the ventilation system at the biosolids building. The scrubber will have a mist eliminator to prevent the water from escaping the stack and will be designed to be operated year round.

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Prince Edward Island

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Government

Article published date

2025-10-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project