SWPCC Biosolids System Upgrades
Sector: Water Supply and Storage • Location: Prince Edward Island, Canada
Source: Infrastructure Canada
This project consists of the installation of a new solid bowl centrifuge and odour control equipment in the existing biosolids building. The centrifuge will require minor electrical wiring and mechanical piping modifications to the existing plant setup. The new centrifuge will replace one existing rotary press and will result in very few changes to the solids handling process upstream. Waste activ
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | completed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project consists of the installation of a new solid bowl centrifuge and odour control equipment in the existing biosolids building. The centrifuge will require minor electrical wiring and mechanical piping modifications to the existing plant setup. The new centrifuge will replace one existing rotary press and will result in very few changes to the solids handling process upstream. Waste activated sludge will continue to be wasted to the rotary drum thickener (RDT) via the existing WAS pumps. Following thickening the sludge will drop into the blend tank where it will be combined with primary sludge prior to being fed to the centrifuge. The existing progressive cavity pumps installed in the sludge blending pump station will deliver the sludge to the new centrifuge. The scrubber will be installed between the existing two stacks of the ventilation system at the biosolids building. The scrubber will have a mist eliminator to prevent the water from escaping the stack and will be designed to be operated year round. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
