SWPCC Biosolids System Upgrades
Completed · Prince Edward Island
Source: Infrastructure Canada
This project consists of the installation of a new solid bowl centrifuge and odour control equipment in the existing biosolids building. The centrifuge will require minor electrical wiring and mechanical piping modifications to the existing plant setup. The new centrifuge will replace one existing rotary press and will result in very few changes to the solids handling process upstream. Waste activ
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Government
- Location
- Prince Edward Island, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about SWPCC Biosolids System Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of the installation of a new solid bowl centrifuge and odour control equipment in the existing biosolids building. The centrifuge will require minor electrical wiring and mechanical piping modifications to the existing plant setup. The new centrifuge will replace one existing rotary press and will result in very few changes to the solids handling process upstream. Waste activated sludge will continue to be wasted to the rotary drum thickener (RDT) via the existing WAS pumps. Following thickening the sludge will drop into the blend tank where it will be combined with primary sludge prior to being fed to the centrifuge. The existing progressive cavity pumps installed in the sludge blending pump station will deliver the sludge to the new centrifuge. The scrubber will be installed between the existing two stacks of the ventilation system at the biosolids building. The scrubber will have a mist eliminator to prevent the water from escaping the stack and will be designed to be operated year round. |
Original sector | Drinking Water and Wastewater |
Budget |
Location
Country | Canada |
State | Prince Edward Island |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Government |
Article published date | 2025-06-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
