logo

SWPCC Biosolids System Upgrades

Sector: Water Supply and Storage • Location: Prince Edward Island, Canada

Source: Infrastructure Canada

Project
Completed

This project consists of the installation of a new solid bowl centrifuge and odour control equipment in the existing biosolids building. The centrifuge will require minor electrical wiring and mechanical piping modifications to the existing plant setup. The new centrifuge will replace one existing rotary press and will result in very few changes to the solids handling process upstream. Waste activ

Project Information FAQ

Project Information

5 Q
The project “SWPCC Biosolids System Upgrades” is an infrastructure initiative in the Water Supply and Storage sector, located in Prince Edward Island, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project consists of the installation of a new solid bowl centrifuge and odour control equipment in the existing biosolids building. The centrifuge will require minor electrical wiring and mechanical piping modifications to the existing plant setup. The new centrifuge will replace one existing rotary press and will result in very few changes to the solids handling process upstream. Waste activated sludge will continue to be wasted to the rotary drum thickener (RDT) via the existing WAS pumps. Following thickening the sludge will drop into the blend tank where it will be combined with primary sludge prior to being fed to the centrifuge. The existing progressive cavity pumps installed in the sludge blending pump station will deliver the sludge to the new centrifuge. The scrubber will be installed between the existing two stacks of the ventilation system at the biosolids building. The scrubber will have a mist eliminator to prevent the water from escaping the stack and will be designed to be operated year round.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data