SWRC Centrifuge Control Panel Replacement Phase II
Sector: Water Supply and Storage • Location: Naperville, Illinois, United States of America
Source: Dodge
DESCRIPTION OF WORK This project involves the removal and replacement of key systems and electrical upgrades to enhance facility operations. The scope includes demolishing existing equipment as outlined in the engineering plans and replacing the centrifuge control panel, polymer blending and feed system, and conductor wires through new and existing conduits. New wiring will be installed, and an ar
- Status
- Prospective
- Sector
- Water Supply and Storage, Commercial, Chemical (Industrial), Waste Processing and Treatment, Power Generation (CCGT), Government, Manufacturing (Industrial)
- Location
- Naperville, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about SWRC Centrifuge Control Panel Replacement Phase II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | DESCRIPTION OF WORK This project involves the removal and replacement of key systems and electrical upgrades to enhance facility operations. The scope includes demolishing existing equipment as outlined in the engineering plans and replacing the centrifuge control panel, polymer blending and feed system, and conductor wires through new and existing conduits. New wiring will be installed, and an arc flash study will be conducted to assess and label new or modified equipment, including the cent... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Naperville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Chemical (Industrial), Waste Processing and Treatment, Power Generation (CCGT), Government, Manufacturing (Industrial) |
Article published date | 2025-02-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
