logo

Sydney Central Station Renovation / Woods Bagot

Sector: Road • Location: Australia

Source: ArchDaily

Project
Closed

“The implementation of open spaces such as the new Northern Concourse roof and finishes and Central Walk significantly improves circulation and station legibility, resulting in a station design that is easy and intuitive for all customers, irrespective of the mode of travel used.”Director of McAslan + Partners’ Sydney studio, Troy Uleman, says, “The reimagined Northern Concourse has created a new

Project Information FAQ

Project Information

3 Q
The project “Sydney Central Station Renovation / Woods Bagot” is an infrastructure initiative in the Road sector, located in Australia. Taiyo aggregates data on it from ArchDaily.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

“The implementation of open spaces such as the new Northern Concourse roof and finishes and Central Walk significantly improves circulation and station legibility, resulting in a station design that is easy and intuitive for all customers, irrespective of the mode of travel used.”Director of McAslan + Partners’ Sydney studio, Troy Uleman, says, “The reimagined Northern Concourse has created a new heart for Central that respects the station's existing Edwardian architecture. The new roof sensitively intersects and contrasts with the heritage sandstone buildings whilst kite-shaped skylights create a unique sense of place.”Text description provided by the architects.Sydney Metro is Australia's biggest infrastructure project. When complete, Sydney will have 31 metro stations and more than 66 kilometres of new metro rail, delivering a world-class transport solution for a global city. Serving 96 percent of Sydney's train services, Central Station forms the backbone of the entire rail network. The upgrade has the capacity to accommodate 40,000 metro passengers every hour – a 60 percent increase on current capacity.“The new metro and concourse insertions are designed to be purposeful, functional, and sculpturally rich to complement the historic qualities of the original station. The selection of materials establishes the proposals into their local context and provides a civic quality to the new station works,” Prentice adds.Unifying the station upgrade is the new North-South Concourse and refurbished Northern Concourse. It replaces dark pedestrian tunnels with a light-filled public room in the tradition of the world's great train halls. New connections dramatically improve orientation and navigation for users and permeability between the surrounding precincts is enhanced.Global Design Director Domenic Alvaro says, “The elemental and material choices for Central are anchored by a deep nostalgia for Sydney’s history. The seamless commuter experience made possible by people-centric design rivals iconic train stations in major cities around the world – creating a station Sydney (and Australia) deserves.”Another key feature of the upgrade is the new Central Walk, a 19-metre-wide underground concourse designed to ease congestion and improve pedestrian flow. The walkway connects Chalmers Street and the Sydney Light Rail directly to the new metro platforms as well as providing easier access to platforms 16-23. Central Walk includes the installation of escalators and lift access to the Suburban platforms for the first time.This once-in-a-century upgrade has been delivered by Laing O’Rourke and designed by Woods Bagot in collaboration with John McAslan Partners. Woods Bagot Principal and Transport Lead John Prentice says, “The design vision and approach place the customer experience at the center of the transformation.”The centerpiece of the upgrade is the construction of two new metro platforms strategically positioned beneath existing Intercity platforms 13 and 14. This addition creates a crucial interchange, linking the new metro with existing suburban, intercity, and regional rail services.Through clever design and industry collaboration, the new Central Station Metro has achieved a 6-Star Green Star Design and As Built rating certification. The refurbished station above has achieved a Leading Infrastructure Sustainability (IS) rating. The new metro offers significantly reduced travel times through its driverless train network, with a 4-minute trip to Martin Place, 9 minutes to North Sydney and just 15 minutes to Chatswood from Central Station.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data