logo

Sykue Thermal Power Plant

Sector: Government • Location: Brazil

Source: World Bank Group

Project
Active

The company Sykue Geracao de Energia Ltda, a wholly-owned subsidiary of Sykue Bioenergya, was granted an authorization by the regulatory agency ANEEL to build a 30-MW thermal power plant located in the state of Bahia(municipality of Sao Desiderio). The thermal power plant was set to use grass as fuel.

In November 2007, Sykue Geracao de Energia Ltda signed a 35-year contract with ANEEL allowing

Status
Prospective
Sector
Government, Geothermal, Commercial, Power Generation (CCGT)
Location
Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Sykue Thermal Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Sykue Thermal Power Plant” is an infrastructure initiative in the Government sector, located in Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The company Sykue Geracao de Energia Ltda, a wholly-owned subsidiary of Sykue Bioenergya, was granted an authorization by the regulatory agency ANEEL to build a 30-MW thermal power plant located in the state of Bahia(municipality of Sao Desiderio). The thermal power plant was set to use grass as fuel. In November 2007, Sykue Geracao de Energia Ltda signed a 35-year contract with ANEEL allowing the company to operate in the electricity market as a independent producer. This authorization granted the sponsor with the right to sell electricity in the Brazilian wholesale market. Almost two-thirds of the capacity is set to be sold to Grupo Pao de Acucar, and the rest to the grid. Sykue Geracao de Energia Ltda committed to invest US$ 50 million (BRL 100 million) in the facility. Financial closure for the project was achieved in March 2009, when the company was granted a US$ 44.6 million (BRL 89.2 million) loan contract from BNDES, a state-owned development bank. Operations commenced in November 2010.

Original sector

Energy

Budget

Location

Country

Brazil

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Government, Geothermal, Commercial, Power Generation (CCGT)

Article published date

2024-09-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project