Sylvan Avenue Bridge Project, TX
Sector: Bridge • Location: Dallas, United States
Source: Ferrovial
Ferrovial Business Lines Projects Sylvan Avenue Bridge Project, TX Dallas, Texas 6 Traffic Lanes 13000CY Substructure Concrete 43000LF Girder Erection 396000SF Reinforced Concrete The new construction eliminated the need to detour traffic during times of flooding. The scope has been to increase traffic capacity from two lanes to six lanes. The existing two-lane roadway sits at an elevation withi
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Close |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Ferrovial Business Lines Projects Sylvan Avenue Bridge Project, TX Dallas, Texas 6 Traffic Lanes 13000CY Substructure Concrete 43000LF Girder Erection 396000SF Reinforced Concrete The new construction eliminated the need to detour traffic during times of flooding. The scope has been to increase traffic capacity from two lanes to six lanes. The existing two-lane roadway sits at an elevation within the Trinity River floodplain and new construction will eliminate the need to detour traffic during times of flooding. Construction begins at Morris St. in West Dallas, extends north across the two levees of the Trinity River, and connects to the Design District at Irving Blvd. The new design, performed by HNTB, will raise the elevation of Sylvan Avenue onto a 3,500 foot-long bridge, and increase traffic capacity to six lanes. It also adds pedestrian access over the Trinity River that includes bicycle lanes and six-foot wide sidewalks on each side of the bridge. The planned construction will also add an access ramp to Trammel Crow Park, a new boat ramp, and continuous streetlights, along with other aesthetic elements. The scope: Increasing traffic capacity from two lanes to six lanesAdding pedestrian access over the Trinity River that includes bicycle lanes and six-foot wide sidewalks on each side of the bridgeInstall an access ramp to Trammel Crow Park, a new boat ramp, and continuous street lights, along with other aesthetic elementsMajor quantities include 13,000 CY of substructure concrete, 43,000 LF of girder erection, and 396,000 SF of reinforced concrete bridge deck |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
