logo

Symetra Building Ti Phase 2

Sector: Commercial • Location: Bellevue, Washington, United States of America

Source: Dodge

Project
Start

Build Out Of Phase 2 At Building Entry / Lobby Level, Which Includes Remodel Of An Existing Commercial Kitchen And Cafe Space For A New Tenant. New Wall, Floor, Ceiling Finishes And New Lighting Throughout Area Of Scope 2., 22 131465 Bz, Mec23-00021 Total Square Feet: 2680

Status
Prospective
Sector
Commercial, Raw Materials, Residential, Consumer Products
Location
Bellevue, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Symetra Building Ti Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Symetra Building Ti Phase 2” is an infrastructure initiative in the Commercial sector, located in Bellevue, Washington, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Start

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Build Out Of Phase 2 At Building Entry / Lobby Level, Which Includes Remodel Of An Existing Commercial Kitchen And Cafe Space For A New Tenant. New Wall, Floor, Ceiling Finishes And New Lighting Throughout Area Of Scope 2., 22 131465 Bz, Mec23-00021 Total Square Feet: 2680

Budget

Location

Country

United States of America (USA)

State

Washington

City

Bellevue

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Commercial, Raw Materials, Residential, Consumer Products

Article published date

2025-02-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project