logo
ProjectClosed

Synthetic Running Track Surface Layer Replacement

Sector: Government • Location: Mississauga, Ontario, Canada

Source: Dodge

The City of Mississauga requires a general contractor for replacement of synthetic running track surface layer at Courtney Park Athletic Fields. Courtneypark track life-cycle replacement including the removal and disposal of the existing synthetic track surface, the opening, cleaning and flushing the trench drains, the supply and installation of a new synthetic track surface with formed in place h

Status
Closed
Sector
Government, Waste Processing and Treatment, Commercial, Water Supply and Storage, Car parking, Automotive
Location
Mississauga, Ontario, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Synthetic Running Track Surface Layer Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Synthetic Running Track Surface Layer Replacement” is an infrastructure initiative in the Government sector, located in Mississauga, Ontario, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The City of Mississauga requires a general contractor for replacement of synthetic running track surface layer at Courtney Park Athletic Fields. Courtneypark track life-cycle replacement including the removal and disposal of the existing synthetic track surface, the opening, cleaning and flushing the trench drains, the supply and installation of a new synthetic track surface with formed in place high resilient EDPM granules bound in a two-component UV-resistant polyurethane resin, as well as ...

Procurement method

Budget

Location

Country

Canada

State

Ontario

City

Mississauga

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Waste Processing and Treatment, Commercial, Water Supply and Storage, Car parking, Automotive

Article published date

2025-03-21

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project