Synthetic Turf Replacement & Drainage & Concrete Repair
Sector: Water Supply and Storage • Location: Abbotsford, British Columbia, Canada
Source: Dodge
The project generally includes the removal and replacement of the existing infilled synthetic turf and shock pad, along with minor drainage and concrete repairs, at one synthetic turf field (MRC #1) at WJ Mouat Secondary School, located at 2355 Mouat Drive, Abbotsford, BC.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Cement, Waste Processing and Treatment, Car parking, Commercial, Raw Materials, Automotive
- Location
- Abbotsford, British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Synthetic Turf Replacement & Drainage & Concrete Repair
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project generally includes the removal and replacement of the existing infilled synthetic turf and shock pad, along with minor drainage and concrete repairs, at one synthetic turf field (MRC #1) at WJ Mouat Secondary School, located at 2355 Mouat Drive, Abbotsford, BC. |
Procurement method | |
Budget |
Location
Country | Canada |
State | British Columbia |
City | Abbotsford |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Cement, Waste Processing and Treatment, Car parking, Commercial, Raw Materials, Automotive |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
