logo

Syr Darya Control & Northern Aral Sea Phase I Project

Sector: Water Supply and Storage • Location: Kazakhstan

Source: World Bank Group

Project
Closed

The first phase of the Syr Darya Control and Northern Aral Sea (NAS) Project, seeks to sustain, and increase agriculture, and fish production in the Syr Darya basin, and secure the NAS existence, by improving ecological and environmental conditions in the delta area. Project components include: 1) restoration of the NAS area, through the construction of a closure dike in the Bering Strait, a chann

Project Information FAQ

Project Information

5 Q
The project “Syr Darya Control & Northern Aral Sea Phase I Project” is an infrastructure initiative in the Water Supply and Storage sector, located in Kazakhstan. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The first phase of the Syr Darya Control and Northern Aral Sea (NAS) Project, seeks to sustain, and increase agriculture, and fish production in the Syr Darya basin, and secure the NAS existence, by improving ecological and environmental conditions in the delta area. Project components include: 1) restoration of the NAS area, through the construction of a closure dike in the Bering Strait, a channel connecting the NAS, and the larger southern Aral Sea (LAS), and, conveying additional flows into the NAS. Current excessive spills will be diverted into the Arnasai depression into the Syr Darya river, to reduce river losses by the construction of flood protection dikes. Major obstructions to river flows between the Chardarah dam and the NAS will be removed, to straighten the river at three locations; 2) improvements on the hydraulic control of the Syr Darya, through an increased capacity of the Syr Darya entity, and diverting downstream flows towards the delta ecosystem to further restore the NAS. Major water infrastructure will be rehabilitated on the Syr Darya and Karaozek branch, to improve irrigated areas, lakes, and hayfields in the basin, while river bed erosion resulting from receding sea water levels will also be improved, through the installation of weirs at Aklak, and hydraulic works for delta lakes, and wetland ecosystems; 3) rehabilitation of the Chardarah dam, through the financing of a first phase program, provided the dam embankment stability is ensured, and additional geo-technical research, and, further hydrological research are undertaken; 4) aquatic resources restoration, and fisheries development through detailed preparation, and implementation phases, anticipating technical assistance, policy reforms, and a new cooperative trading organization, in addition to co-financing possibilities; and, 5) monitoring and evaluation will be provided, and, project management, and institutional development will be supported.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data