Syrdarya CCGT

Sector: Water Supply and Storage • Location: Uzbekistan

Source: International Finance Corporation (IFC)

Project
Active

The proposed IFC investment is up to US$70mn A-loan and an interest rate swap to cover up to US$200mn aggregate loan notional for the IFC A Loan and ECA-covered commercial loans in order to finance the construction of a 1,600 MW greenfield combined cycle gas turbine (“CCGT”) IPP project in the Syrdarya region of Uzbekistan (“Syrdarya CCGT Project” or the “Project”). The overall cost of the project

Project Information FAQ

Project Information

4 Q
The project “Syrdarya CCGT” is an infrastructure initiative in the Water Supply and Storage sector, located in Uzbekistan. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed IFC investment is up to US$70mn A-loan and an interest rate swap to cover up to US$200mn aggregate loan notional for the IFC A Loan and ECA-covered commercial loans in order to finance the construction of a 1,600 MW greenfield combined cycle gas turbine (“CCGT”) IPP project in the Syrdarya region of Uzbekistan (“Syrdarya CCGT Project” or the “Project”). The overall cost of the project is currently estimated at approximately US$950mn. Additional financing is being provided by JBIC and NEXI. The project was awarded through competitive tendering process (supported by IFC advisory) to the consortium of EDF (331/3%), Nebras (331/3%), Sojitz (19%) and Kyuden (141/3%) (collectively the “Sponsors”) in December 2021.The project is located in the Boyovut district, approximately 2 km northeast of the city of Shirin, in the Syrdarya region of Uzbekistan, approximately 150 km south of Tashkent. The project site is adjacent to the Syrdarya 1 IPP (currently under construction) and approximately 1.5km North of an existing gas fired thermal power plant established in 1970’s and hereinafter referred to as the Syrdarya TPP. The sponsors have established a special purpose vehicle called ENERSOK LLC (Project Company) to deliver the project and have entered into a 25-year Power Purchase Agreement (PPA) with JSC ‘National Electric Grid of Uzbekistan’ (NEGU), who will be the off-taker of the generated electricity.In accordance with the requirements of the PPA, construction will start in 2023 and the first gas turbine will start operating in simple cycle from February 2025. The plant will be fully operational with two gas turbines and one steam turbine in combined cycle configuration starting from February 2026. ENERSOK has selected an EPC contractor (Harbin Electric International Company Limited) to deliver the engineering design of the facility, procure all equipment and build all temporary and permanent facilities of the project. The EPC contractor was selected through a competitive tender process from five international EPC Contractors considering financial, technical and E&S qualifications.The main project facilities will include:• Power block and stacks including two Gas Turbines (GT), two Heat Recovery Steam Generators (HRSG) and one Steam Turbine (ST);• Closed Loop Cooling Water system, with mechanical draft air cooling tower blocks;Gas receiving terminal;• Access road• Intake and outfall corridor to a surface water canal, known as the YG Canal;• Raw water treatment plant;• Wastewater treatment plants (industrial and sanitary); • Ancillary/support facilities (i.e. electrical system, site entrance and security building)• 500/220kv switchgear station shared with and being constructed by the adjacent ACWA Power Sirdarya 1,500MW CCGT Power Plant. The access road will be parallel to the project intake/outfall corridor to YG canal. In addition, one of the drainage ditches to the south of the project site will require modification/rerouting works to ensure its functionality and to avoid potential flooding in the area during storm events. This will be undertaken by the EPC contractor as part of the project.Associated Facilities (AFs) will be limited to the following: • 1 km gas pipeline connection to an existing gas supply system to be constructed by  NEGU (or its appointed contractor) and operated by the gas supplier, JSC Uztransgaz.• Re-routing of an existing 500kV Overhead Transmission Line (OHTL) by NEGU before mid-2023. The OHTL currently runs through the centre of the project site and will be rerouted alongside its western boundary.                                                   

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data