Syrdarya CCGT
The status, timeline and source of this project. A free account opens every field.
Source: International Finance Corporation (IFC)
The proposed IFC investment is up to US$70mn A-loan and an interest rate swap to cover up to US$200mn aggregate loan notional for the IFC A Loan and ECA-covered commercial loans in order to finance the construction of a 1,600 MW greenfield combined cycle gas turbine (“CCGT”) IPP project in the Syrdarya region of Uzbekistan (“Syrdarya CCGT Project” or the “Project”). The overall cost of the project
- Status
- Prospective
- Sector
- Water Supply and Storage, Raw Materials, Power Generation (CCGT), Geothermal, Power Transmission, Road, Manufacturing (Industrial), Commercial, Wind, Waste Processing and Treatment, Government
- Location
- Uzbekistan
- Updated
- 22 Jul 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about Syrdarya CCGT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed IFC investment is up to US$70mn A-loan and an interest rate swap to cover up to US$200mn aggregate loan notional for the IFC A Loan and ECA-covered commercial loans in order to finance the construction of a 1,600 MW greenfield combined cycle gas turbine (“CCGT”) IPP project in the Syrdarya region of Uzbekistan (“Syrdarya CCGT Project” or the “Project”). The overall cost of the project is currently estimated at approximately US$950mn. Additional financing is being provided by JBIC and NEXI. The project was awarded through competitive tendering process (supported by IFC advisory) to the consortium of EDF (331/3%), Nebras (331/3%), Sojitz (19%) and Kyuden (141/3%) (collectively the “Sponsors”) in December 2021.The project is located in the Boyovut district, approximately 2 km northeast of the city of Shirin, in the Syrdarya region of Uzbekistan, approximately 150 km south of Tashkent. The project site is adjacent to the Syrdarya 1 IPP (currently under construction) and approximately 1.5km North of an existing gas fired thermal power plant established in 1970’s and hereinafter referred to as the Syrdarya TPP. The sponsors have established a special purpose vehicle called ENERSOK LLC (Project Company) to deliver the project and have entered into a 25-year Power Purchase Agreement (PPA) with JSC ‘National Electric Grid of Uzbekistan’ (NEGU), who will be the off-taker of the generated electricity.In accordance with the requirements of the PPA, construction will start in 2023 and the first gas turbine will start operating in simple cycle from February 2025. The plant will be fully operational with two gas turbines and one steam turbine in combined cycle configuration starting from February 2026. ENERSOK has selected an EPC contractor (Harbin Electric International Company Limited) to deliver the engineering design of the facility, procure all equipment and build all temporary and permanent facilities of the project. The EPC contractor was selected through a competitive tender process from five international EPC Contractors considering financial, technical and E&S qualifications.The main project facilities will include:• Power block and stacks including two Gas Turbines (GT), two Heat Recovery Steam Generators (HRSG) and one Steam Turbine (ST);• Closed Loop Cooling Water system, with mechanical draft air cooling tower blocks;Gas receiving terminal;• Access road• Intake and outfall corridor to a surface water canal, known as the YG Canal;• Raw water treatment plant;• Wastewater treatment plants (industrial and sanitary); • Ancillary/support facilities (i.e. electrical system, site entrance and security building)• 500/220kv switchgear station shared with and being constructed by the adjacent ACWA Power Sirdarya 1,500MW CCGT Power Plant. The access road will be parallel to the project intake/outfall corridor to YG canal. In addition, one of the drainage ditches to the south of the project site will require modification/rerouting works to ensure its functionality and to avoid potential flooding in the area during storm events. This will be undertaken by the EPC contractor as part of the project.Associated Facilities (AFs) will be limited to the following: • 1 km gas pipeline connection to an existing gas supply system to be constructed by NEGU (or its appointed contractor) and operated by the gas supplier, JSC Uztransgaz.• Re-routing of an existing 500kV Overhead Transmission Line (OHTL) by NEGU before mid-2023. The OHTL currently runs through the centre of the project site and will be rerouted alongside its western boundary. |
Original sector | V-AB - Gas - Thermal Power Generation |
Location
Country | Uzbekistan |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Raw Materials, Power Generation (CCGT), Geothermal, Power Transmission, Road, Manufacturing (Industrial), Commercial, Wind, Waste Processing and Treatment, Government |
Article published date | 2026-01-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Uzbekistan
- Fergana Refinery Modernisation
- UZBEKISTAN WATER FRAMEWORK LOAN
- Sirdarya CCGT Power Plant Shirin
- Tashkent water improvement contract
- Bukhara & Samarkand water supply project
- Uzbekistan: Surkhandarya 1,560MW CCGT Power Plant
- Uzbekistan: Bukhara Road Network Improvement Project Phase 2
- Uzbekistan: Karakalpakstan and Khorezm Water Supply and Sanitation Project