logo
ProjectRepaying

Syrdarya Power Project

The status, timeline and source of this project. A free account opens every field.

Source: European Bank for Reconstruction and Development (EBRD)

Provision of a loan for the construction, commissioning and operation of a new 1.5 GW combined cycle gas turbine power plant in the Syrdarya region of the Republic of Uzbekistan (the “Project”). The Project is part of an ongoing modernisation of the power generation sector in Uzbekistan aimed at increasing efficiency and reducing environmental impacts. ESIA disclosure package Download English vers

Status
Under Construction
Sector
Road, Water Supply and Storage, Government, Wind, Power Generation (CCGT), Residential, Commercial
Location
Uzbekistan
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Syrdarya Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Syrdarya Power Project” is an infrastructure initiative in the Road sector, located in Uzbekistan. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Sponsoring Agency

Status

Original status

repaying

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Provision of a loan for the construction, commissioning and operation of a new 1.5 GW combined cycle gas turbine power plant in the Syrdarya region of the Republic of Uzbekistan (the “Project”). The Project is part of an ongoing modernisation of the power generation sector in Uzbekistan aimed at increasing efficiency and reducing environmental impacts. ESIA disclosure package Download English versions in Zip format Download Russian versions in Zip format Download Uzbek versions in Zip format https://www.acwapower.com/en/projects/sirdarya-ccgt/ Sherzod K. Onarkulov International Business Center Block-A, 13th Floor 107-B, Amir Temur Avenue Tashkent, 100084, Uzbekistan T + 998 71 238 9960 M + 998 90 003 9960 And Alkis Vryenios Drakinos Tashkent Resident Office European Bank For Reconstruction and Development 13th floor, Banking Association of Uzbekistan 1,Qoratosh Street, Tashkent, 100027 Uzbekistan Tel.: +998781404400 Environmental and social enquiries Bernardo Del Castillo BDelCastillo@acwapower.com Hicham El Maanouni helmaanouni@acwapower.com T: +971 278 3001 General enquiries Tom Teerlynck TTeerlynck@acwapower.com Hicham El Maanouni helmaanouni@acwapower.com, T: +971 278 3001

Original sector

Energy

Procurement method

Budget

Location

Country

Uzbekistan

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Government, Wind, Power Generation (CCGT), Residential, Commercial

Article published date

2025-07-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project