Syrdarya Power Project
The status, timeline and source of this project. A free account opens every field.
Source: European Bank for Reconstruction and Development (EBRD)
Provision of a loan for the construction, commissioning and operation of a new 1.5 GW combined cycle gas turbine power plant in the Syrdarya region of the Republic of Uzbekistan (the “Project”). The Project is part of an ongoing modernisation of the power generation sector in Uzbekistan aimed at increasing efficiency and reducing environmental impacts. ESIA disclosure package Download English vers
- Status
- Under Construction
- Sector
- Road, Water Supply and Storage, Government, Wind, Power Generation (CCGT), Residential, Commercial
- Location
- Uzbekistan
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Syrdarya Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | repaying |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Provision of a loan for the construction, commissioning and operation of a new 1.5 GW combined cycle gas turbine power plant in the Syrdarya region of the Republic of Uzbekistan (the “Project”). The Project is part of an ongoing modernisation of the power generation sector in Uzbekistan aimed at increasing efficiency and reducing environmental impacts. ESIA disclosure package Download English versions in Zip format Download Russian versions in Zip format Download Uzbek versions in Zip format https://www.acwapower.com/en/projects/sirdarya-ccgt/ Sherzod K. Onarkulov International Business Center Block-A, 13th Floor 107-B, Amir Temur Avenue Tashkent, 100084, Uzbekistan T + 998 71 238 9960 M + 998 90 003 9960 And Alkis Vryenios Drakinos Tashkent Resident Office European Bank For Reconstruction and Development 13th floor, Banking Association of Uzbekistan 1,Qoratosh Street, Tashkent, 100027 Uzbekistan Tel.: +998781404400 Environmental and social enquiries Bernardo Del Castillo BDelCastillo@acwapower.com Hicham El Maanouni helmaanouni@acwapower.com T: +971 278 3001 General enquiries Tom Teerlynck TTeerlynck@acwapower.com Hicham El Maanouni helmaanouni@acwapower.com, T: +971 278 3001 |
Original sector | Energy |
Procurement method | |
Budget |
Location
Country | Uzbekistan |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Government, Wind, Power Generation (CCGT), Residential, Commercial |
Article published date | 2025-07-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Uzbekistan
- Fergana Refinery Modernisation
- South-West Gissar Project
- Kandym Gas Processing Complex (KGPC)
- Second CAREC Corridor 2 Road Investment Program - Tranche 3
- CAREC Corridor 2 Road Investment Program - Tranche 2
- CAREC Regional Road Project
- Angren Power Station New Unit
- CAREC Corridor 2 Road Investment Program - Tranche 3
