Syria Electricity Emergency Project

One of 311 projects Taiyo tracks in Syrian Arab Republic.

Source: World Bank Group

SEEP comprises two investment components (Components 1 and 2), one TA component (Component 3), and one project implementation support component (Component 4).Component 1: Rehabilitation of Damaged High-Voltage Transmission Lines. The activities under Component 1 will focus on rehabilitating high voltage transmission lines including two critical 400 kV high-voltage interconnector transmission lines

Status
Prospective
Sector
Solar, Power Transmission, Wind, Power Generation (CCGT), Government, Commercial
Location
Syrian Arab Republic
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Syria Electricity Emergency Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Syria Electricity Emergency Project” is an infrastructure initiative in the Solar sector, located in Syrian Arab Republic. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

SEEP comprises two investment components (Components 1 and 2), one TA component (Component 3), and one project implementation support component (Component 4).Component 1: Rehabilitation of Damaged High-Voltage Transmission Lines. The activities under Component 1 will focus on rehabilitating high voltage transmission lines including two critical 400 kV high-voltage interconnector transmission lines in Syria that were damaged during the conflict, restoring Syria’s regional connectivity to Jordan and Turkiye. The restored transmission lines are essential for enabling electricity imports into Syria and improving the stability of PETDE’s electricity network. Rehabilitating both lines is considered a no-regret investment that will benefit electricity consumers across Syria for several reasons, including facilitating electricity imports into Syria, connecting Syria’s electricity system back to the regional interconnection network, and contributing to improving the grid stability and reducing the frequency of the blackouts through connecting the Syrian network to stronger networks with adequate frequency control.Component 2: Rehabilitation of Damaged High-Voltage Substations. This component focuses on rehabilitating damaged high-voltage transformer substations and providing necessary spare parts and maintenance equipment. Rehabilitating the damaged substations will benefit electricity consumers across Syria for several reasons. First, restoring the damaged substations near demand centers in the most impacted areas will enable the PETDE to optimize the power flow across its network, reduce high loading levels on existing substations that currently serve the impacted areas, reduce the technical losses and improve operational flexibility of the entire power system. As such, the quality of service for the consumers across PETDE network is expected to improve.Component 3: Technical Assistance for Electricity Sector Development and Institutional Capacity Building. This component will provide TA to (a) inform the Government’s key electricity sector strategies, policy and regulatory reforms, and investment plans for medium to long term sustainability and (b) support the electricity sector institutional capacity to implement these strategies and reforms.Component 4: Project Implementation Support. This component will support the PETDE in implementing the Project using international best practices. It will finance the necessary operational expenses to implement the project. Additionally, it will finance the hiring of a qualified consulting firm, through an international competitive tender process, to act as PETDE’s Owner Engineer (OE). The OE will assist PETDE’s Project Management Team (PMT) by providing essential project management, engineering, site supervision, environmental, social, health and safety, and financial management services during both the construction phase and the subsequent project closure periods.

Original sector

Energy and Mineral Resources

Location

Country

Syrian Arab Republic

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Solar, Power Transmission, Wind, Power Generation (CCGT), Government, Commercial

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project