System Efficiency Improvement, Equitization & Renewables Project

Sector: Solar • Location: Viet Nam

Source: World Bank

The objective of the Project is to improve the overall efficiency of power system services, particularly to the poor in rural areas, by optimizing the transmission systems, and upgrading sub-transmissions, and medium voltage distribution lines for rural electrification. The project components are as follows: 1) Power system efficiency will be improved by upgrading the 500 KV, and 200 KV transmissi

Status
Closed
Sector
Solar, Power Generation (CCGT), Biomass, Wind, Geothermal, Hydro, Government
Location
Vietnam
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about System Efficiency Improvement, Equitization & Renewables Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “System Efficiency Improvement, Equitization & Renewables Project” is an infrastructure initiative in the Solar sector, located in Viet Nam. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objective of the Project is to improve the overall efficiency of power system services, particularly to the poor in rural areas, by optimizing the transmission systems, and upgrading sub-transmissions, and medium voltage distribution lines for rural electrification. The project components are as follows: 1) Power system efficiency will be improved by upgrading the 500 KV, and 200 KV transmission networks, and associated substations, which includes the installation of capacitors to selected substations. The system peak load will be reduced, through the implementation of several demand-side management (DSM) measures - to be supported by an associated DSM and Energy Efficiency Project, financed by the Global Environment Facility and the private sector - in an aim to further DSM impacts, and catalyze the development of sustainable energy efficiency. 2) Rural electricity access will be improved by upgrading, and strengthening the 110 KV sub-transmission line, and substations, restoring five existing hydropower plants, and, by construction of a small-scale hybrid wind-diesel power plant at Phu Quoc Island. Moreover, a pilot of twenty community-based hybrid renewable-energy grids in remote areas, will be tried and developed. 3) Sector reform, and institutional development will be pursued, through improvements in the management information system, the creation of one District, and several commune-level joint-stock distribution companies, and, by strengthening the regulation, planning, and implementation capacity for renewable electricity. To this end, operational training, and technical assistance will be provided.

Original sector

FY17 - Energy and Extractives,FY17 - Public Administration

Budget

Location

Country

Vietnam

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT), Biomass, Wind, Geothermal, Hydro, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project