Systemic Pedestrian Safety Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
This Contract provides for the improvement of the intersection of North 5th Avenue and West D Street, including but not limited to curb extensions, storm drainage improvements, crossing improvements, RRFB installation, excavation, grading, subgrade preparation, cement concrete curb, gutters, curb ramps, sidewalks, hot mix asphalt pavement repair, pavement marking, miscellaneous surface restoration
- Status
- Closed
- Sector
- Cement, Car parking, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Automotive, Commercial
- Location
- Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Systemic Pedestrian Safety Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This Contract provides for the improvement of the intersection of North 5th Avenue and West D Street, including but not limited to curb extensions, storm drainage improvements, crossing improvements, RRFB installation, excavation, grading, subgrade preparation, cement concrete curb, gutters, curb ramps, sidewalks, hot mix asphalt pavement repair, pavement marking, miscellaneous surface restoration, permanent signing, and traffic control. The contract also provided for the improvements of ten ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Cement, Car parking, Road, Government, Water Supply and Storage, Waste Processing and Treatment, Automotive, Commercial |
Article published date | 2024-10-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
