The project involves the development, construction and operation of an onshore MW 250 wind farm along the northern shores of Lake Syvash in the Kherson region of southern Ukraine. The SPV is called SyvashEnergoProm LLC and it is owned by Total Eren SA of France, NBT AS of Norway and Al Gihaz of Saudi Arabia. The total project cost is EUR 376.81 million ($ 428.45 million). In support of the constr

Project Information FAQ

Project Information

4 Q
The project “Syvash Wind Power Project” is an infrastructure initiative in the Wind sector, located in Ukraine. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project involves the development, construction and operation of an onshore MW 250 wind farm along the northern shores of Lake Syvash in the Kherson region of southern Ukraine. The SPV is called SyvashEnergoProm LLC and it is owned by Total Eren SA of France, NBT AS of Norway and Al Gihaz of Saudi Arabia. The total project cost is EUR 376.81 million ($ 428.45 million). In support of the construction of the initial capacity of 133 MW phase (phase one) SyvashEnergoProm will receive EUR 155 million ($ 176.24 million) loan from: EBRD providing A-loan of EUR 75 million ($ 85.28 million), Green for Growth Fund providing EUR 25 million ($28.43 million) and the Netherlands Development Finance Company (FMO) providing B-loan of up to EUR 50 million ($ 56.85 million) and Nordic Environment Finance Corporation (NEFCO) providing a parallel loan of EUR 5 million (5.69 million). Financial close for this financing package has been reached in January 2019. In April 2019, additional EUR 107.6 million ($ 122.35 million) have been agreed in support of the second stage of the project with a generating capacity of 117 MW. This brings the total debt financing for the project to EUR 262.6 million ($ 298.59 million). The second package has been contracted with the Black Sea Trade and Development Bank (BSTDB) contributing EUR 30 million ($ 34.11 million), Finnfund contributing EUR 15 million ($ 17.06 million), Danish Investment Fund for Developing Countries IFU contributing EUR 15 million ($ 17.06 million) and French Development Finance Institution Proparco contributing EUR 42.6 million ($ 48.42 million) and NEFCO contributing EUR 5 million ($ 5.9 million). Once commissioned, the project is expected to be the largest renewable energy project in Ukraine to date. 1,320 hectares of land have been leased for 49-years and SyvashEnergoProm has secured a grid connection agreement with Ukrenergo, the Ukrainian transmission system operator. SyvashEnergoProm has a license to generate renewable energy under the green feed-in-tariff regime of Ukraine, valid until 1 January 2030. https://www.ebrd.com/news/2019/ebrd-supports-largest-windfarm-in-ukraine-.html https://www.ebrd.com/work-with-us/projects/psd/uself-nbt-syvash-wind.html https://www.fmo.nl/project-detail/54812 https://www.ggf.lu/fileadmin/user_upload/08_press/pdf/2019-01_Press_Release_%E2%80%93_GGF_contributes_EUR_25_million_to_Syvash_wind_project.pdf https://www.nefco.org/news/nefco-co-finances-the-largest-windfarm-in-ukraine/ https://www.bstdb.org/project-center/projects-financed_3743.htm?ProjectID=OP/18/0038 https://www.bstdb.org/news-and-events/press-releases/press-releases_4629.htm https://www.finnfund.fi/en/news/finnfund-invests-in-ukraines-largest-windfarm/ https://www.proparco.fr/en/ukraine-proparco-has-allocated-eur-43m-loan-construction-wind-farm https://www.ifu.dk/en/news/ifu-co-finances-large-wind-farm-project-in-ukraine/ https://www.total-eren.com/wp-content/uploads/2019/04/PR_ENG_Syvash-Financing-II-TE-NBT_AlGihaz-FINALv3.pdf http://www.nbtas.no/en/projects-ukraine/ukraine

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data