Szczecin-Swinoujscie Seaway & Port Modernization Project
Sector: Road • Location: Poland
Source: World Bank Group
The Szczecin-Swinoujscie Seaway and Port Modernization Project aims to promote Poland's trade by developing an efficient administrative/managerial structure and improving physical facilities in the main ports of Gdansk, Gdynia, and Szczecin-Swinoujscie. The project has four components. 1) Physical Modernization of Szczecin-Swinoujscie Seaway will include strengthening the banks of parts of the cha
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Manufacturing (Industrial), Seaport, Commercial, Government, Residential
- Location
- Poland
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Szczecin-Swinoujscie Seaway & Port Modernization Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Szczecin-Swinoujscie Seaway and Port Modernization Project aims to promote Poland's trade by developing an efficient administrative/managerial structure and improving physical facilities in the main ports of Gdansk, Gdynia, and Szczecin-Swinoujscie. The project has four components. 1) Physical Modernization of Szczecin-Swinoujscie Seaway will include strengthening the banks of parts of the channel over a total length of 2,600 meters on both sides, rebuilding intermediate breakwaters, establishing containment areas for dredged materials in the vicinity of Szczecin, and providing technical assistance to define and implement environmentally sound dredging methods. 2) Maritime Office Szczecin (MOS) Technical Assistance and Training will provide for technical assistance and training to help MOS define and implement environmentally sound dredging methods. 3) Szczecin-Swinoujscie Seaport Authority: Katowice Peninsula will include land preparation and construction of berthing facilities to provide additional operational space to be leased out to private enterprises and operators, for cargo handling, storage, and packaging facilities, mainly for industrial bulks. 4) Szczcin-Swinoujscie Seaport Authority: Grabowski Island will include land preparation and construction of berthing facilities to provide additional operational space to be leased out to private enterprises and operators. |
Original sector | FY17 - Transportation |
Budget |
Location
Country | Poland |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Manufacturing (Industrial), Seaport, Commercial, Government, Residential |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Poland
- Design and construction of 8.6 km of the S19 highway between Solec and Odcinek (Poland)
- Ostroleka C CombinedCycle Power Plant Poland
- Baltic Power Offshore Wind Farm Baltic Sea
- Poland-Slovakia Gas Interconnection
- POLAND ROAD MODERNISATION II
- POLAND - A4 HIGHWAYS PROJECT (A+B)
- TORUN URBAN INFRASTRUCTURE
- A2 MOTORWAY BERLIN-WARS -POZNAN BYPASS
