logo
ProjectStart

T-Bar Lift Replacement

Sector: Power Generation (CCGT) • Location: Farmington, Maine, United States of America

Source: Dodge

Replacement of the old T-bar lift at Titcomb Mountain with a new, taller, and quieter lift. The project includes excavation for new tower holes, concrete work, and installation of new towers and lift equipment. It also involved a three-phase power upgrade.

Status
Prospective
Sector
Power Generation (CCGT), Commercial, Manufacturing (Industrial), Cement
Location
Farmington, Maine, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about T-Bar Lift Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “T-Bar Lift Replacement” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Farmington, Maine, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

start

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Replacement of the old T-bar lift at Titcomb Mountain with a new, taller, and quieter lift. The project includes excavation for new tower holes, concrete work, and installation of new towers and lift equipment. It also involved a three-phase power upgrade.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Maine

City

Farmington

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Commercial, Manufacturing (Industrial), Cement

Article published date

2025-09-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project