T Bennet - Martell Line Rebuild
Sector: Power Transmission • Location: Lincoln, Nebraska, United States of America
Source: Dodge USA
Rebuild 3.1 miles of the existing 345kV Line 3503 with bundled T2 IBIS conductors from structure 87 to structure 68. The poles were inspected/tested/treated in 2012 and 2018. The original 345 kV line between Mark Moore and 128th & Pioneers was installed in 1971 using wood pole K-frame structures, will be 56 years old in 2027, and is reaching the end of its useful life
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Pre-Design |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Rebuild 3.1 miles of the existing 345kV Line 3503 with bundled T2 IBIS conductors from structure 87 to structure 68. The poles were inspected/tested/treated in 2012 and 2018. The original 345 kV line between Mark Moore and 128th & Pioneers was installed in 1971 using wood pole K-frame structures, will be 56 years old in 2027, and is reaching the end of its useful life |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |