T Lockport Lincoln Avenue Extension Sanitary Sewer Replace
Sector: Water Supply and Storage • Location: Lockport, New York, United States of America
Source: Dodge
Lockport Lincoln Avenue Extension Sanitary Sewer Replacement Work consists of the replacement of 820 lineal feet of 15-inch asbestos cement gravity sewer line, manholes, and sewer services along the south side of Lincoln Avenue Extension to the extents shown on the plans. This work shall also include the proper disposal of all asbestos pipe. The work also includes crossing the road via open cut wi
- Status
- Prospective
- Sector
- Water Supply and Storage, Raw Materials, Waste Processing and Treatment, Road, Government, Commercial
- Location
- Lockport, New York, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about T Lockport Lincoln Avenue Extension Sanitary Sewer Replace
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Lockport Lincoln Avenue Extension Sanitary Sewer Replacement Work consists of the replacement of 820 lineal feet of 15-inch asbestos cement gravity sewer line, manholes, and sewer services along the south side of Lincoln Avenue Extension to the extents shown on the plans. This work shall also include the proper disposal of all asbestos pipe. The work also includes crossing the road via open cut with a casing pipe and carrier pipe with a connection to an existing manhole. The work shall also i... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New York |
City | Lockport |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Raw Materials, Waste Processing and Treatment, Road, Government, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
