T-Mobile - Chicago, IL
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
No changes proposed for building type or occupancy group 1. New Sales area fixtures Partitions and doors back of house furniture finishes in all areas ceiling in sales area ceiling in back of house Lighting in all areas minor electrical 2. Existing to remain Storefront Partitions and doors Back of house furniture Hard lid ceilings Mechanical system Plumbing fixtures and system Fire safety equipmen
- Status
- Closed
- Sector
- Power Generation (CCGT), Commercial, Manufacturing (Industrial)
- Location
- Chicago, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about T-Mobile - Chicago, IL
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Sub Bidding, Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | No changes proposed for building type or occupancy group 1. New Sales area fixtures Partitions and doors back of house furniture finishes in all areas ceiling in sales area ceiling in back of house Lighting in all areas minor electrical 2. Existing to remain Storefront Partitions and doors Back of house furniture Hard lid ceilings Mechanical system Plumbing fixtures and system Fire safety equipment Electrical service Egress |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Chicago |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Manufacturing (Industrial) |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
