logo
ProjectNotice Of Completion

T2 Security Upgrades

The status, timeline and source of this project. A free account opens every field.

Source: Dodge USA

The project scope includes a renovation of the existing T2 security exit from the sterile side to landside baggage claim location and incorporating a new Exit Lane Breach Control system as the main control of the exit pathway. Minor demolition of existing partitions and doors to accommodate construction of a new aluminum and glass enclosure with secured swinging and telescoping doors at levels one

Status
Closed
Sector
Metal, Airport, Power Generation (CCGT), Road, Steel, Government, Commercial, Manufacturing (Industrial)
Location
Oakland, California, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about T2 Security Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “T2 Security Upgrades” is an infrastructure initiative in the Metal sector, located in Oakland, California, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

notice of completion

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project scope includes a renovation of the existing T2 security exit from the sterile side to landside baggage claim location and incorporating a new Exit Lane Breach Control system as the main control of the exit pathway. Minor demolition of existing partitions and doors to accommodate construction of a new aluminum and glass enclosure with secured swinging and telescoping doors at levels one and two, respectively. The scope also includes all electrical, low voltage, security camera, acc...

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Oakland

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Metal, Airport, Power Generation (CCGT), Road, Steel, Government, Commercial, Manufacturing (Industrial)

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project