T2224-01 Construct Solar Array - FMS Building 5175
Sector: Commercial • Location: Missouri, United States of America (USA)
Source: Office of administration, Missouri
The project includes the installation of a 10 KW PV Solar Array on the roof structure of the FMS (Building 5175), Fort Leonard Wood, MO. Installation to include multiple Solar cells, DC to AC inverters, structural framing for mounting of the arrays on top of a standing metal seam roof, wiring, conduit, disconnects and controls.
- Status
- Closed
- Sector
- Commercial, Metal, Solar, Residential, Government
- Location
- Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Office of administration, Missouri
ConstructChat
Ask ConstructChat about T2224-01 Construct Solar Array - FMS Building 5175
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | bidding closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes the installation of a 10 KW PV Solar Array on the roof structure of the FMS (Building 5175), Fort Leonard Wood, MO. Installation to include multiple Solar cells, DC to AC inverters, structural framing for mounting of the arrays on top of a standing metal seam roof, wiring, conduit, disconnects and controls. |
Location
Country | United States of America (USA) |
State | Missouri |
Source
Source reliability | High |
Source | Office of administration, Missouri |
URL |
More Details
Record type | Project |
Sector | Commercial, Metal, Solar, Residential, Government |
Article published date | 2023-12-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in United States of America (USA)
- McCarty, Madrona, and Willow - Phase IV(a)
- Milgard Hall
- Reimagining TPS Ground—A Campus Living Room
- Mechanical and Civil Engineering Labs
- Haggett Hall Demolition and Replacement
- Interdisciplinary Engineering Building (IEB)
- FM 1960 Access Management Study from East Gatewick to BF 1960A
- Texas Electric Vehicle Infrastructure Plan
