T3 Collingwood
Sector: Cement • Location: Melbourne, Victoria, Australia
Source: ArchitectureAu
T3 Collingwood is a 15-storey mass timber building located in Melbourne, designed to be the world's eighth tallest of its kind. The project emphasizes biophilic design and sustainability, featuring a hybrid mass timber construction that reduces embodied carbon compared to traditional concrete structures.
- Status
- Closed
- Sector
- Cement, Forest Products and Packaging, Commercial
- Location
- Melbourne, Victoria, Australia
- Updated
- 22 Jul 2026
- Source
- ArchitectureAu
ConstructChat
Ask ConstructChat about T3 Collingwood
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | T3 Collingwood is a 15-storey mass timber building located in Melbourne, designed to be the world's eighth tallest of its kind. The project emphasizes biophilic design and sustainability, featuring a hybrid mass timber construction that reduces embodied carbon compared to traditional concrete structures. |
Original sector | Tall buildings, Workplace |
Location
Country | Australia |
State | Victoria |
City | Melbourne |
Source
Source | ArchitectureAu |
URL |
More Details
Record type | Project |
Sector | Cement, Forest Products and Packaging, Commercial |
Article published date | 2025-03-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
