logo

TA for the Ruzizi III Project

Sector: Commercial • Location: Rwanda

Source: European Union Africa Infrastructure Trust Fund

Project
Under Disbursement

The project consists of the construction of a 147 MW Hydropower Plant on the Ruzizi River bordering DRC and Rwanda. It will be developed as a Public Private Partnership, through a concession provided by the Governments of Burundi, DRC and Rwanda to the preferred investor (Sponsor), IPS-SN Power, to develop, finance, build, operate and maintain the plant. Ruzizi III will be the third hydropower dev

Project Information FAQ

Project Information

5 Q
The project “TA for the Ruzizi III Project” is an infrastructure initiative in the Commercial sector, located in Rwanda. Taiyo aggregates data on it from European Union Africa Infrastructure Trust Fund.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

under disbursement

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project consists of the construction of a 147 MW Hydropower Plant on the Ruzizi River bordering DRC and Rwanda. It will be developed as a Public Private Partnership, through a concession provided by the Governments of Burundi, DRC and Rwanda to the preferred investor (Sponsor), IPS-SN Power, to develop, finance, build, operate and maintain the plant. Ruzizi III will be the third hydropower development on the Ruzizi River following the existing plants, Ruzizi I (29.8 MW) and Ruzizi II (43.8 MW). The Governments are responsible for the construction of the entire public infrastructure necessary to evacuate the power to the three countries. The project will supply capacity and energy under long-term Power Purchase Agreements (PPAs) to the respective public utility companies that distribute electricity in the three countries in the Great Lakes Region, namely: (i) Régie de Production et Distribution d’Eau et d’Electricité of the Republic of Burundi (“REGIDESO”), Société Nationale d’Electricité of the Democratic Republic of Congo (“SNEL”), and Energy and Water Sanitation Authority of the Republic of Rwanda (“EWSA”) (collectively, the “Offtakers”). The contracting states may hold up to 30% of the equity in the form of preferred shares with a fixed dividend. The private partner will hold the majority in the project company and will have management control. Ruzizi III will be the first project in the region with this type of structure, and will be a flagship for private sector participation in infrastructure development in the region. It will not only provide low-cost, safe, and environmentally friendly electricity in a region suffering from a lack of energy, but it is also expected to have a positive impact on future private sector investments. The TA grant will be used to finance an Engineer with a broad range of technical, financial, legal and socio-economic responsibilities to support EGL (project executing agency) and the three States in their decision making from the preparation of the project Ruzizi III until its implementation/operation. The activities range from the review of the tender documents to supervision during the commercial operation.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data