logo

Taber Culvert Replacement

Sector: Water Supply and Storage • Location: Taber, Alberta, Canada

Source: Dodge

Project
Closed

This project will involve the removal and disposal of the existing dual (2) 1630 mm (span) x 1120 mm (rise) x 40 m long Corrugated Steel Pipe (CSP) Arches and the installation of one (1) new 800 mm x 41 m long Corrugated Steel Pipe at Township Road 140 over a Bow River Irrigation District (BRID) Canal at SW 03-14-16 W4M north of Vauxhall, AB. The scope of work for this project includes, but is not

Status
Closed
Sector
Water Supply and Storage, Government, Road, Steel, Waste Processing and Treatment, Commercial, Metal
Location
Taber, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Taber Culvert Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Taber Culvert Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Taber, Alberta, Canada. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project will involve the removal and disposal of the existing dual (2) 1630 mm (span) x 1120 mm (rise) x 40 m long Corrugated Steel Pipe (CSP) Arches and the installation of one (1) new 800 mm x 41 m long Corrugated Steel Pipe at Township Road 140 over a Bow River Irrigation District (BRID) Canal at SW 03-14-16 W4M north of Vauxhall, AB. The scope of work for this project includes, but is not limited to the following: Mobilization Site Occupancy Traffic Accommodation (Road Closure Local ...

Procurement method

Budget

Location

Country

Canada

State

Alberta

City

Taber

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Road, Steel, Waste Processing and Treatment, Commercial, Metal

Article published date

2025-09-29

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project