The Taboada Wastewater Treatment Plant was a 25-year BOT to provide wastewater services under an offtake agreement with Sedepal, the state-owned utility serving Lima and Callao provinces. The project was to be implemented in three phases: an initial capacity of 7m3 per second, rising to 10.5m3 per second, and finally 14m3. The final phase was the equivalent of 1,210 m3 per day. It was to treat the

Project Information FAQ

Project Information

5 Q
The project “Taboada Wastewater Treatment Plant” is an infrastructure initiative in the Water Supply and Storage sector, located in Peru. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Taboada Wastewater Treatment Plant was a 25-year BOT to provide wastewater services under an offtake agreement with Sedepal, the state-owned utility serving Lima and Callao provinces. The project was to be implemented in three phases: an initial capacity of 7m3 per second, rising to 10.5m3 per second, and finally 14m3. The final phase was the equivalent of 1,210 m3 per day. It was to treat the wastewater produced by 4 million people from 27 districts, or roughly 56% of the population of Lima and Callao provinces and increase the percentage of treated water from 9% to 72% in those provinces. The project, together with the Huasacocha Wastewater Treatment Plant, was to treat 100% of the wastewater in the provinces. The project was awarded to ACS [Spain] in February 2009 through a competitive tender launched by Proinversion, Peru's private investment promotion agency. There were three final bidders. Bidding was based on a formula that included several variables, principally: number of months to complete the project, the amount of subsidy for capital expenditure (RPI) and operation and maitenance of the plant (RPMO). ACS was selected after submitting the lowest rate for wastewater treatment at 0.2277 soles/m3 of treated water, equivalent to 33% less than the amount established in the bidding rules. ACS formed Planta de Tratamiento de Aguas Residuales Taboada SA as the project company. The total project cost was US $149.5 million. In February 2011, ACS closed a S./942 million ($340 million) local currency bond financing for the project. The issuance used RPICAOs, certificates with payment obligations for completed construction milestons up to 2013, as collateral for the issuance. The bonds stretched the ACS payment obligations by maturing in 2025. The financing was led by BNP Paribas,and received a AAA local and BBB global rating from Fitch. The Reg S bonds had an initial coupon of 5.965%, which were to be adjusted for inflation. Operations commenced in January 2013.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data