TABORA RURAL DEV.(R/
Closed · Tanzania
Source: World Bank Group
The Tabora Rural Development Project will be implemented over a 5-year period and consists of: (1) inputs and improved extension services for crops and livestock in approximately 42 villages; (2) low-cost water supply program and funding for Water Master Plan; (3) improvement of access and network roads and strengthening of maintenance capacity; (4) reafforestation programs for 15 selected villag
- Status
- Closed
- Sector
- Road, Water Supply and Storage, Raw Materials, Government
- Location
- Tanzania
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about TABORA RURAL DEV.(R/
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Tabora Rural Development Project will be implemented over a 5-year period and consists of: (1) inputs and improved extension services for crops and livestock in approximately 42 villages; (2) low-cost water supply program and funding for Water Master Plan; (3) improvement of access and network roads and strengthening of maintenance capacity; (4) reafforestation programs for 15 selected villages; (5) production of land use and land capability plan; and (6) technical assistance. |
Original sector | Agriculture, Fishing and Forestry |
Location
Country | Tanzania |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Tanzania
- Open for FDI through a minority stake/Development of a new project/Processing and preserving of fish and fish products/BLUE PROCESSING COMPANY .LTD
- Open for FDI through a minority stake/Purchase of new machinery and equipment/Manufacture of made-up textile articles, except apparel/GSM FOAM CO LTD
- Open for FDI through a minority stake/Establishment of an additional production facility/Manufacture of plastics products/Jafnob Printing and Packaging Ltd
- Open for FDI through a minority stake/Purchase of new machinery and equipment/Manufacture of basic iron and steel/Quaim Steel Mills Ltd
- Open for FDI through a minority stake/Establishment of an additional production facility/Manufacture of articles of concrete, cement and plaster/Lake Group (Premix)
- Open for FDI through a majority stake/Purchase of new machinery and equipment/Manufacture of machinery for food, beverage and tobacco processing/Tall Welding & Fabrications
- Dar es Salaam Water Distribution
- Kahama Mining Corp. Ltd.
