logo

Tache Hall Music, Art, and Theatre Complex

Sector: Commercial • Location: Canada

Source: Bird Construction

Project
Unknown

Bird completed phase two of the renovation and adaptive re-use of the 100-year-old Taché Residence Hall. Built in 1912, the building has two four-storey wings and a central block. The brick, limestone detailing, cornices, and columns have all been restored, along with the central entrance flanked by twin block towers. The original terrazzo flooring in the corridors has been restored, as well as th

Project Information FAQ

Project Information

3 Q
The project “Tache Hall Music, Art, and Theatre Complex” is an infrastructure initiative in the Commercial sector, located in Canada. Taiyo aggregates data on it from Bird Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

unknown

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Bird completed phase two of the renovation and adaptive re-use of the 100-year-old Taché Residence Hall. Built in 1912, the building has two four-storey wings and a central block. The brick, limestone detailing, cornices, and columns have all been restored, along with the central entrance flanked by twin block towers. The original terrazzo flooring in the corridors has been restored, as well as the original embossed wall panelling and crown mouldings for the glass-enclosed music library and listening room. Balancing the restoration and new construction provided the team with many unique challenges, including replacing the mechanical and electrical systems to ensure the building’s code compliance. All radiant heat was removed and replaced with individual fan coil units in each room. Similarly, the electrical services were non-compliant and required a new power supply and switch gear to power the redevelopment. Affected by many unknown conditions, Bird worked closely with the design team to investigate the issues as they arose and provided imaginative solutions, while still maintaining the original design intent. Bird is currently working on the third phase, the Desautels Faculty of Music, a new 4,830 m2 addition. It contains custom-designed spaces for band, orchestra, choir, opera, and electro-acoustical programs.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data