Tache Hall Music, Art, and Theatre Complex
Sector: Commercial • Location: Canada
Source: Bird Construction
Bird completed phase two of the renovation and adaptive re-use of the 100-year-old Taché Residence Hall. Built in 1912, the building has two four-storey wings and a central block. The brick, limestone detailing, cornices, and columns have all been restored, along with the central entrance flanked by twin block towers. The original terrazzo flooring in the corridors has been restored, as well as th
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | unknown |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Bird completed phase two of the renovation and adaptive re-use of the 100-year-old Taché Residence Hall. Built in 1912, the building has two four-storey wings and a central block. The brick, limestone detailing, cornices, and columns have all been restored, along with the central entrance flanked by twin block towers. The original terrazzo flooring in the corridors has been restored, as well as the original embossed wall panelling and crown mouldings for the glass-enclosed music library and listening room. Balancing the restoration and new construction provided the team with many unique challenges, including replacing the mechanical and electrical systems to ensure the building’s code compliance. All radiant heat was removed and replaced with individual fan coil units in each room. Similarly, the electrical services were non-compliant and required a new power supply and switch gear to power the redevelopment. Affected by many unknown conditions, Bird worked closely with the design team to investigate the issues as they arose and provided imaginative solutions, while still maintaining the original design intent. Bird is currently working on the third phase, the Desautels Faculty of Music, a new 4,830 m2 addition. It contains custom-designed spaces for band, orchestra, choir, opera, and electro-acoustical programs. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
