Taco Bell Restaurant
Sector: Consumer Products • Location: Orlando, Florida, United States of America
Source: Dodge USA
Exterior facade modifications, new interior and exterior finishes, new dining room furniture and dining room elements. All new finishes in kitchen and back of house. Existing equipment will need to be removed for new finishes, protected during construction, cleaned, and reinstalled in a similar location. AC-3/SP
- Status
- Prospective
- Sector
- Consumer Products, Raw Materials, Commercial
- Location
- Orlando, Florida, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Taco Bell Restaurant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Exterior facade modifications, new interior and exterior finishes, new dining room furniture and dining room elements. All new finishes in kitchen and back of house. Existing equipment will need to be removed for new finishes, protected during construction, cleaned, and reinstalled in a similar location. AC-3/SP |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Orlando |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Raw Materials, Commercial |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
