Taft Street & Meadow Terrace Site Work Phase 3
Sector: Water Supply and Storage • Location: Essex Junction, Vermont, United States of America
Source: Dodge
Roads, Sidewalks and Curbs a. Establish and maintain erosion control measures and stabilized construction entrance before earthwork commences. b. Establish and maintain horizontal and vertical survey control staking and site layout. Engineer to provide AutoCAD file and initial control point coordinates. c. Attend a preconstruction meeting with the Owner, Engineer and Representatives of the City of
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Car parking, Automotive, Waste Processing and Treatment, Government, Commercial
- Location
- Essex Junction, Vermont, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Taft Street & Meadow Terrace Site Work Phase 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Roads, Sidewalks and Curbs a. Establish and maintain erosion control measures and stabilized construction entrance before earthwork commences. b. Establish and maintain horizontal and vertical survey control staking and site layout. Engineer to provide AutoCAD file and initial control point coordinates. c. Attend a preconstruction meeting with the Owner, Engineer and Representatives of the City of Essex Junction to coordinate work schedules, permits, signage and inspection requirements with t... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Vermont |
City | Essex Junction |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Car parking, Automotive, Waste Processing and Treatment, Government, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
