Tahoe Barracks Deferred Maintenance
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The purpose of the project is to update and increase efficiency of existing barracks by replacing all electrical fixtures with LED lights, upgrade all switches and plugs, run electrical tests, and upgrade breaker boxes accordingly. Replace most windows with similar style retrofit double-pane windows and replace HVAC units and duct work. This work will be required on 17 separate buildings scattered
- Status
- Prospective
- Sector
- Power Generation (CCGT), Manufacturing (Industrial), Commercial, Residential
- Location
- Nevada City, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Tahoe Barracks Deferred Maintenance
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | gc bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The purpose of the project is to update and increase efficiency of existing barracks by replacing all electrical fixtures with LED lights, upgrade all switches and plugs, run electrical tests, and upgrade breaker boxes accordingly. Replace most windows with similar style retrofit double-pane windows and replace HVAC units and duct work. This work will be required on 17 separate buildings scattered across the Tahoe National Forest. LED Lighting Replace all light fixtures in specified buildings... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Nevada City |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Manufacturing (Industrial), Commercial, Residential |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
