logo

Tahoe Keys Sheet Pile Bulkhead

Sector: Seaport • Location: CA, United States of America (USA)

Source: Anvil Builders

Project

This project consisted of constructing a new sheet pile bulkhead wall along the eastern bulkhead of the access channel to the Tahoe Keys Marina. Anvil Builders installed approximately 575 feet of new, coated, sheet pile in front of the existing, deteriorated sheet pile wall. Additional scopes of work included the installation of 63 helical anchors, 550 feet of double C Channel waler system, 63 wee

Project Information FAQ

Project Information

3 Q
The project “Tahoe Keys Sheet Pile Bulkhead” is an infrastructure initiative in the Seaport sector, located in CA, United States of America (USA). Taiyo aggregates data on it from Anvil Builders.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This project consisted of constructing a new sheet pile bulkhead wall along the eastern bulkhead of the access channel to the Tahoe Keys Marina. Anvil Builders installed approximately 575 feet of new, coated, sheet pile in front of the existing, deteriorated sheet pile wall. Additional scopes of work included the installation of 63 helical anchors, 550 feet of double C Channel waler system, 63 weep holes, 575 feet of sheet pile cap, drainage improvements, partial demolition of the existing sheet pile wall, grading, and surface restoration. Anvil Builders self-performed all of the work with the exception of the waler installation. The majority of the work was performed by land, with minor work being performed on a floating work platform. Anvil Builders successfully completed this project on-time during one TRPA Grading season, overcoming obstacles such as long lead times, and the Caldor Fire which shut down work for three weeks.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data