Tahoe Valley Stormwater & Greenbelt Improvement Phase 2
Sector: Water Supply and Storage • Location: South Lake Tahoe, California, United States of America
Source: Dodge USA
Work to be performed includes, but is not limited to: traffic control, pavement saw-cutting, removal and disposal of existing AC pavement surfaces, tree removal, construction staking, earthwork grading, off-haul of earthen materials and tree stumps, grading and compaction, storm drain pipe removal, adjust utilities to grade, water service line relocations, storm drain system construction (drainage
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Power Transmission, Power Generation (CCGT), Road, Car parking, Commercial, Automotive
- Location
- South Lake Tahoe, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Tahoe Valley Stormwater & Greenbelt Improvement Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Work to be performed includes, but is not limited to: traffic control, pavement saw-cutting, removal and disposal of existing AC pavement surfaces, tree removal, construction staking, earthwork grading, off-haul of earthen materials and tree stumps, grading and compaction, storm drain pipe removal, adjust utilities to grade, water service line relocations, storm drain system construction (drainage inlets, storm drain laterals, storm drain main, and treatment basins and swales), water main adj... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | South Lake Tahoe |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Power Transmission, Power Generation (CCGT), Road, Car parking, Commercial, Automotive |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
