Tahsis Flood Protection Improvements Project: Phase 3
Sector: Waste Processing and Treatment • Location: British Columbia, Canada
Source: Infrastructure Canada
This application is for phase 3 of a 4-phase project to protect Tahsis’ North Village from riverine and coastal floods up to 1:200 year rainfall levels (accounting for storm, tide and sea level rise effects). An estimated ~$41 million worth of public and private assets and essential infrastructure is currently at risk in the North Village - including our public works yard, water supply well pumpin
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Water Supply and Storage
- Location
- British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Tahsis Flood Protection Improvements Project: Phase 3
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-construction |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This application is for phase 3 of a 4-phase project to protect Tahsis’ North Village from riverine and coastal floods up to 1:200 year rainfall levels (accounting for storm, tide and sea level rise effects). An estimated ~$41 million worth of public and private assets and essential infrastructure is currently at risk in the North Village - including our public works yard, water supply well pumping station, salmon hatchery, ambulance station, RCMP station, fire hall, recreation complex/emergency reception centre, daycare, and elementary/secondary school. Via phases 1 and 2 (funded), we are completing or have completed various enhancements to dikes, detention ponds, pump and drainage infrastructure, and the North Maquinna Dr. lock block flood wall along the Tahsis River. In this third phase, we will extend the North Maquinna Dr. lock block flood wall by 520m, and add a 60m earth berm terminating near the river mouth. All phases of work are informed by a comprehensive Flood Risk Assessment (2019). We are working closely with our local First Nation and collaborating with regional partners. This project’s focus on structural assets is being complemented by other work to control future development in the floodplain (including via a newly-adopted floodplain management bylaw), and by efforts to relocate essential infrastructure - where feasible - out of the floodplain entirely (including our sewage treatment system and fire hall). This project includes: -140m long flood wall at an approximate height of 0.75m (1 Lock Block in height). -380m long flood wall at an approximate height of 1.50m (2 Lock Blocks in height). -60m long earth berm at an approximate maximum height of 2.5m. -Internal drainage improvements (catch basins, leads, and flap gates) along the flood wall and berm. -Various riprap bank stabilization along the riverbank to accommodate the wall and berm loads. -Environmental offsetting measures (to replace disturbed fish habitat at a ratio of 2:1) |
Original sector | Climate Resilience |
Location
Country | Canada |
State | British Columbia |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage |
Article published date | 2026-06-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
