logo

Tai Durango Solar Power Project

Sector: Solar • Location: Mexico

Source: World Bank Group

Project
Active

The Spanish company Eosol Energy Mexico was awarded the license to build and operate a solar farm, municipality of Durango, state of Durango. The Tai Durango project was designed to have a total capacity of 169 MW structured in three phases, with the first set of power units having a capacity of 16.8 MW. The electricity generated by the power plant was set to be directed to the Mexican national gr

Status
Prospective
Sector
Solar, Raw Materials, Power Generation (CCGT), Government, Commercial
Location
Mexico
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Tai Durango Solar Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Tai Durango Solar Power Project” is an infrastructure initiative in the Solar sector, located in Mexico. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Spanish company Eosol Energy Mexico was awarded the license to build and operate a solar farm, municipality of Durango, state of Durango. The Tai Durango project was designed to have a total capacity of 169 MW structured in three phases, with the first set of power units having a capacity of 16.8 MW. The electricity generated by the power plant was set to be directed to the Mexican national grid. The total investment in the solar farm was estimated at US$ 1000 million. The first phase involved an investment of US$ 37.6 million (Pesos 500 million) and commenced operations in May 2014. The other phases were set to be operational by 2016.

Original sector

Energy

Budget

Location

Country

Mexico

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Solar, Raw Materials, Power Generation (CCGT), Government, Commercial

Article published date

2024-09-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project