Tailem Bend 2 Hybrid Project
Completed · South Australia · Last reported Jan 2025
Source: Energy-Storage.News
Vena Energy has added a 41.5MW battery energy storage system (BESS) to an existing 87MW solar PV power plant in South Australia, marking the successful commissioning of the Tailem Bend 2 Hybrid Project. This project integrates solar and battery storage to optimize energy dispatch and support grid stability.
- Status
- Closed
- Sector
- Solar, Energy Storage, Power Generation (CCGT)
- Location
- Tailem Bend, South Australia, Australia
- Updated
- 22 Jul 2026
- Source
- Energy-Storage.News
ConstructChat
Ask ConstructChat about Tailem Bend 2 Hybrid Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Vena Energy has added a 41.5MW battery energy storage system (BESS) to an existing 87MW solar PV power plant in South Australia, marking the successful commissioning of the Tailem Bend 2 Hybrid Project. This project integrates solar and battery storage to optimize energy dispatch and support grid stability. |
Original sector | Energy |
Location
Country | Australia |
State | South Australia |
City | Tailem Bend |
Source
Source | Energy-Storage.News |
URL |
More Details
Record type | Project |
Sector | Solar, Energy Storage, Power Generation (CCGT) |
Article published date | 2025-01-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
