logo

Taizhou City Solid Waste Power Plant

Sector: Water Supply and Storage • Location: China

Source: World Bank Group

Project
Active

Construction of the solid waste power plant in Taizhou City, Zhejiang Province commenced in March 2011. The sponsor a local private company Mizuda Group had a 100% stake in the project. The total investment was RMB 295 million (US$ 45.67 million). Capacity of the plant was 12MW. It came into operation in Aug 2012. The concession term was not reported. A special project vehicle Taizhou Wangneng Env

Status
Prospective
Sector
Water Supply and Storage, Biomass, Commercial, Power Generation (CCGT), Government, Waste Processing and Treatment, Automotive
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Taizhou City Solid Waste Power Plant

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Taizhou City Solid Waste Power Plant” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Construction of the solid waste power plant in Taizhou City, Zhejiang Province commenced in March 2011. The sponsor a local private company Mizuda Group had a 100% stake in the project. The total investment was RMB 295 million (US$ 45.67 million). Capacity of the plant was 12MW. It came into operation in Aug 2012. The concession term was not reported. A special project vehicle Taizhou Wangneng Environmental Protection Co., Ltd. was set up to conduct the agreement. At least 25% of construction had been achieved by Aug 2011.

Original sector

Municipal Solid Waste

Procurement method

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Biomass, Commercial, Power Generation (CCGT), Government, Waste Processing and Treatment, Automotive

Article published date

2024-09-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project