logo

Tajikistan: Obigarm-Nurobod Road Project - Long Bridge and Approaches

Sector: Water Supply and Storage • Location: Tajikistan

Source: Asian Infrastructure Investment Bank (AIIB)

Project
Approved

The proposed Project will construct a 920-meter bridge and its approaches (the Long Bridge) on Obigarm-Nurobod section of M41 Highway to replace the existing segment that will be submerged by the Rogun dam reservoir. The alignment replacement will ensure continued connectivity along a vital transport corridor in Tajikistan that connects central part of the country with northeast and border to the

Project Information FAQ

Project Information

5 Q
The project “Tajikistan: Obigarm-Nurobod Road Project - Long Bridge and Approaches” is an infrastructure initiative in the Water Supply and Storage sector, located in Tajikistan. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

approved

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed Project will construct a 920-meter bridge and its approaches (the Long Bridge) on Obigarm-Nurobod section of M41 Highway to replace the existing segment that will be submerged by the Rogun dam reservoir. The alignment replacement will ensure continued connectivity along a vital transport corridor in Tajikistan that connects central part of the country with northeast and border to the Kyrgyz Republic. The Obigarm-Nurobod section of M41 Highway (75km) is referred to as the Overall Project, which has been divided into three sections: (i) The Obigarm-Tagikamar section is about 30km long financed by ADB and OFID; it is hereinafter referred to as Section 1; (ii) The Tagikamar-Nurobod section is about 44km long financed by the EBRD; it is hereinafter referred to as Section 2; and (iii) The 920-meter-long bridge and its approaches will be financed by AIIB; it is referred to as Section 3 or the Project.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data