logo
ProjectApproved

Tajikistan: Rogun Hydropower Development Project - Phase 1

Approved · Tajikistan

Source: Asian Infrastructure Investment Bank (AIIB)

A proposed Project supports the construction of a hydropower plant, currently in progress, with a designed generation capacity of 3,780 MW, a 335-meter-high dam, a reservoir area of 170km2, and a total reservoir capacity of 13.3km3. It is located on the Vakhsh River (a tributary of the Amu Darya River), 110 kilometers from the capital city of Dushanbe, upstream of the Nurek Hydropower Plant. The l

Status
Prospective
Sector
Water Supply and Storage, Chemical (Industrial), Power Generation (CCGT), Manufacturing (Industrial), Natural Gas, Tunnel, Hydro, Government
Location
Tajikistan
Updated
22 Jul 2026
Source
Asian Infrastructure Investment Bank (AIIB)

ConstructChat

Ask ConstructChat about Tajikistan: Rogun Hydropower Development Project - Phase 1

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Tajikistan: Rogun Hydropower Development Project - Phase 1” is an infrastructure initiative in the Water Supply and Storage sector, located in Tajikistan. Taiyo aggregates data on it from Asian Infrastructure Investment Bank (AIIB).

Participants

Sponsoring Agency

Status

Original status

approved

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A proposed Project supports the construction of a hydropower plant, currently in progress, with a designed generation capacity of 3,780 MW, a 335-meter-high dam, a reservoir area of 170km2, and a total reservoir capacity of 13.3km3. It is located on the Vakhsh River (a tributary of the Amu Darya River), 110 kilometers from the capital city of Dushanbe, upstream of the Nurek Hydropower Plant. The large reservoir can provide seasonal regulation, supplying firm energy during the winter season and reliable electricity to meet growing domestic demands at an affordable cost. Furthermore, it has the potential to export clean energy to Central Asian countries, generating significant export revenue for many years to come. The design of the HPP is assessed for exposure to physical climate risks, and appropriate risk mitigation measures will be incorporated to reduce the plant's vulnerability to climate hazards during construction and especially at the operation stage. The Project has been assessed against European climate policies and confirmed in compliance with the joined MDB Paris Agreement alignment methodology on both climate mitigation (BB1) and climate adaptation (BB2). Rogun HPP can also act as a balancing plant for Tajikistan and the broader Central Asia region, facilitating easier integration of intermittent renewable energy and contributing to decarbonizing the fossil-fuel-dominated Central Asia power systems. In Phase 1, AIIB is considering investing USD 200 million in certain components of the Project. Further phases of development will be reviewed at a later stage by reflecting on the progress to date.

Original sector

Energy

Budget

Location

Country

Tajikistan

Source

Source

Asian Infrastructure Investment Bank (AIIB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Chemical (Industrial), Power Generation (CCGT), Manufacturing (Industrial), Natural Gas, Tunnel, Hydro, Government

Article published date

2025-12-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project