Tajikistan: Rogun Hydropower Development Project - Phase 1
Sector: Hydro • Location: Tajikistan
Source: Asian Infrastructure Investment Bank (AIIB)
A proposed Project supports the construction of a hydropower plant, currently in progress, with a designed generation capacity of 3,780 MW, a 335-meter-high dam, a reservoir area of 170km2, and a total reservoir capacity of 13.3km3. It is located on the Vakhsh River (a tributary of the Amu Darya River), 110 kilometers from the capital city of Dushanbe, upstream of the Nurek Hydropower Plant. The l
- Status
- Prospective
- Sector
- Hydro, Power Generation (CCGT), Natural Gas, Water Supply and Storage, Chemical (Industrial), Tunnel, Manufacturing (Industrial), Government
- Location
- Tajikistan
- Updated
- 22 Jul 2026
- Source
- Asian Infrastructure Investment Bank (AIIB)
ConstructChat
Ask ConstructChat about Tajikistan: Rogun Hydropower Development Project - Phase 1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | proposed |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A proposed Project supports the construction of a hydropower plant, currently in progress, with a designed generation capacity of 3,780 MW, a 335-meter-high dam, a reservoir area of 170km2, and a total reservoir capacity of 13.3km3. It is located on the Vakhsh River (a tributary of the Amu Darya River), 110 kilometers from the capital city of Dushanbe, upstream of the Nurek Hydropower Plant. The large reservoir can provide seasonal regulation, supplying firm energy during the winter season and reliable electricity to meet growing domestic demands at an affordable cost. Furthermore, it has the potential to export clean energy to Central Asian countries, generating significant export revenue for many years to come. The design of the HPP is assessed for exposure to physical climate risks, and appropriate risk mitigation measures will be incorporated to reduce the plant's vulnerability to climate hazards during construction and especially at the operation stage. The Project has been assessed against European climate policies and confirmed in compliance with the joined MDB Paris Agreement alignment methodology on both climate mitigation (BB1) and climate adaptation (BB2). Rogun HPP can also act as a balancing plant for Tajikistan and the broader Central Asia region, facilitating easier integration of intermittent renewable energy and contributing to decarbonizing the fossil-fuel-dominated Central Asia power systems. In Phase 1, AIIB is considering investing USD 200 million in certain components of the Project. Further phases of development will be reviewed at a later stage by reflecting on the progress to date. |
Original sector | Energy |
Budget |
Location
Country | Tajikistan |
Source
Source | Asian Infrastructure Investment Bank (AIIB) |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT), Natural Gas, Water Supply and Storage, Chemical (Industrial), Tunnel, Manufacturing (Industrial), Government |
Article published date | 2024-08-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
